Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2004 |
Principal Product | SULFURIC ACID |
NAICS | 325180 - Other Basic Inorganic Chemical Manufacturing |
SIC | 2819 - Industrial Inorganic Chemicals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 20 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 300,000 Tons |
Production Hrs. Annual | 8,568 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $572,801 | 16,558,451 | kWh | $0.03 |
Natural Gas | $222 | 1 | MMBtu | $222.00 |
TOTAL ENERGY COSTS | $573,023 | |||
RECOMMENDED SAVINGS* | $94,730 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,781 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Energy | Administrative Changes | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Other Energy | Administrative Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $160 Cost: $300 |
$160 | 4,690 | - | - | - | - | - | - | - | - |
$160 4,690 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING |
Savings: $3,294 Cost: $21,890 |
- | - | - | - | - | - | $3,294 | - | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
$3,294 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $809 Cost: $1,970 |
$809 | 21,100 | - | - | - | - | - | - | - | - |
$809 21,100 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $130 Cost: $200 |
$90 | 2,760 | $40 | 6 | - | - | - | - | - | - |
$90 2,760 kWh |
$40 6 MMBtu |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,365 Cost: $3,895 |
- | - | - | - | $2,365 | 473 | - | - | - | - |
- - kWh |
- - MMBtu |
$2,365 473 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $83,000 Cost: $300,000 |
$83,000 | 2,370,000 | - | - | - | - | - | - | - | - |
$83,000 2,370,000 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $4,972 Cost: - |
- | - | - | - | - | - | - | - | $4,972 | - |
- - kWh |
- - MMBtu |
- - MMBtu |
- - $ |
$4,972 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $94,730 Cost: $328,255 |
$84,059 | 2,398,550 | $40 | 6 | $2,365 | 473 | $3,294 | - | $4,972 | - | $84,059 2,398,550 kWh |
$40 6 MMBtu |
$2,365 473 MMBtu |
$3,294 - $ |
$4,972 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,781 Cost: $1,970 |
$809 | 21,100 | - | - | - | - | - | - | $4,972 | - | $809 21,100 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
$4,972 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Energy | Administrative Changes | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Other Energy | Administrative Changes | One-time Revenue or Avoided Cost |