IAC Assessment: GT0790
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0790
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2004
Principal Product SULFURIC ACID
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 20
Plant Area (Sq.Ft.) 200,000
Annual Production 300,000 Tons
Production Hrs. Annual 8,568
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $572,801 16,558,451 kWh $0.03
Natural Gas $222 1 MMBtu $222.00
TOTAL ENERGY COSTS $573,023
RECOMMENDED SAVINGS* $94,730 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,781
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Natural Gas Other Energy Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ MMBtu $ $ $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$160
Cost:
$300
$160 4,690 - - - - - - - - $160
4,690
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$3,294
Cost:
$21,890
- - - - - - $3,294 - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$3,294
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$809
Cost:
$1,970
$809 21,100 - - - - - - - - $809
21,100
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$130
Cost:
$200
$90 2,760 $40 6 - - - - - - $90
2,760
kWh
$40
6
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,365
Cost:
$3,895
- - - - $2,365 473 - - - - -
-
kWh
-
-
MMBtu
$2,365
473
MMBtu
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$83,000
Cost:
$300,000
$83,000 2,370,000 - - - - - - - - $83,000
2,370,000
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,972
Cost:
-
- - - - - - - - $4,972 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
$4,972
-
$
TOTAL RECOMMENDED Savings:
$94,730
Cost:
$328,255
$84,059 2,398,550 $40 6 $2,365 473 $3,294 - $4,972 - $84,059
2,398,550
kWh
$40
6
MMBtu
$2,365
473
MMBtu
$3,294
-
$
$4,972
-
$
TOTAL IMPLEMENTED Savings:
$5,781
Cost:
$1,970
$809 21,100 - - - - - - $4,972 - $809
21,100
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
$4,972
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Natural Gas Other Energy Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Natural Gas Other Energy Administrative Changes One-time Revenue or Avoided Cost