IAC Assessment: GT0794
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0794
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2004
Principal Product School Buses
NAICS 336211 - Motor Vehicle Body Manufacturing
SIC 3713 - Truck And Bus Bodies
Sales $100,000,000-$500,000,000
# of Employees 375
Plant Area (Sq.Ft.) 295,000
Annual Production 4,000 Pieces
Production Hrs. Annual 4,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $175,838 3,786,300 kWh $0.05
Electricity Demand $82,509 9,216 kW-months/year $8.95
Electricity Fees $12,173 - $ -
TOTAL ENERGY COSTS $270,520
RECOMMENDED SAVINGS* $46,723 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,405
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$15,414
Cost:
$30,000
- - - - $15,414 1,551 - - -
-
kWh
-
-
kW-months/year
$15,414
1,551
MMBtu
-
-
Tgal
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,785
Cost:
$3,525
$1,785 48,670 - - - - - - $1,785
48,670
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$595
Cost:
$765
$595 16,248 - - - - - - $595
16,248
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,306
Cost:
$2,046
$1,098 30,000 $1,208 90 - - - - $1,098
30,000
kWh
$1,208
90
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$5,022
Cost:
$3,380
$352 9,620 $775 58 - - $3,895 1,310,000 $352
9,620
kWh
$775
58
kW-months/year
-
-
MMBtu
$3,895
1,310,000
Tgal
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,490
Cost:
$2,500
$8,490 232,036 - - - - - - $8,490
232,036
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$729
Cost:
$1,500
$66 1,817 - - $663 67 - - $66
1,817
kWh
-
-
kW-months/year
$663
67
MMBtu
-
-
Tgal
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,773
Cost:
$4,900
- - - - $8,773 772 - - -
-
kWh
-
-
kW-months/year
$8,773
772
MMBtu
-
-
Tgal
09: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,609
Cost:
-
$1,892 46,920 $1,717 282 - - - - $1,892
46,920
kWh
$1,717
282
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$46,723
Cost:
$48,616
$14,278 385,311 $3,700 430 $24,850 2,390 $3,895 1,310,000 $14,278
385,311
kWh
$3,700
430
kW-months/year
$24,850
2,390
MMBtu
$3,895
1,310,000
Tgal
TOTAL IMPLEMENTED Savings:
$14,405
Cost:
$4,546
$11,480 308,956 $2,925 372 - - - - $11,480
308,956
kWh
$2,925
372
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal