IAC logo
IAC Assessment: GT0795
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0795
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2004
Principal Product COTTON BLENDED FABRIC
NAICS 313320 - Fabric Coating Mills
SIC 2211 - Broadwoven Fabric Mills, Cotton
Sales n/a
# of Employees 150
Plant Area (Sq.Ft.) 500,000
Annual Production 67,150 Thousand Feet
Production Hrs. Annual 8,568
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $539,129 29,631,600 kWh $0.02
Electricity Demand $437,955 49,944 kW-months/year $8.77
Electricity Fees $14,115 - $ -
Natural Gas $124,212 22,329 MMBtu $5.56
TOTAL ENERGY COSTS $1,115,411
RECOMMENDED SAVINGS* $178,024 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$43,709
Cost:
-
$21,667 940,800 $22,042 2,688 - - - - - - - - $21,667
940,800
kWh
$22,042
2,688
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$42,201
Cost:
$34,000
$27,972 1,214,600 $14,229 1,735 - - - - - - - - $27,972
1,214,600
kWh
$14,229
1,735
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$30,353
Cost:
-
$20,119 873,600 $10,234 1,248 - - - - - - - - $20,119
873,600
kWh
$10,234
1,248
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$12,828
Cost:
$48,861
$6,065 263,340 $3,085 377 - - - - $3,678 - - - $6,065
263,340
kWh
$3,085
377
kW-months/year
-
-
MMBtu
-
-
$
$3,678
-
$
-
-
Tgal
05: 3.4155 METER WASTE WATER Savings:
$7,272
Cost:
-
- - - - - - $7,272 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,272
-
$
-
-
$
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,890
Cost:
$836
$2,580 112,056 $1,310 160 - - - - - - - - $2,580
112,056
kWh
$1,310
160
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$5,380
Cost:
$4,000
- - - - $4,270 769 - - - - $1,110 - -
-
kWh
-
-
kW-months/year
$4,270
769
MMBtu
-
-
$
-
-
$
$1,110
-
Tgal
08: 2.7122 DISCONNECT BALLASTS Savings:
$1,696
Cost:
$3,640
$1,124 48,800 $572 70 - - - - - - - - $1,124
48,800
kWh
$572
70
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
09: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$18,125
Cost:
$6,300
- - - - $18,125 3,260 - - - - - - -
-
kWh
-
-
kW-months/year
$18,125
3,260
MMBtu
-
-
$
-
-
$
-
-
Tgal
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,570
Cost:
$2,910
$7,850 341,163 $4,720 576 - - - - - - - - $7,850
341,163
kWh
$4,720
576
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$178,024
Cost:
$100,547
$87,377 3,794,359 $56,192 6,854 $22,395 4,029 $7,272 - $3,678 - $1,110 - $87,377
3,794,359
kWh
$56,192
6,854
kW-months/year
$22,395
4,029
MMBtu
$7,272
-
$
$3,678
-
$
$1,110
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Water Consumption