Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2005 |
Principal Product | Plastic and Metal Fastners |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 149 |
Plant Area (Sq.Ft.) | 169,700 |
Annual Production | 206,000,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $514,449 | 10,141,873 | kWh | $0.05 |
Natural Gas | $35,099 | 3,821 | MMBtu | $9.19 |
TOTAL ENERGY COSTS | $549,548 | |||
RECOMMENDED SAVINGS* | $165,317 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $157,107 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Ancillary Material Cost | Water Consumption | Electricity Usage | Natural Gas | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,893 Cost: $3,800 |
$1,893 | 66,173 | - | - | - | - | - | - |
$1,893 66,173 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $22,440 Cost: $1,500 |
$22,440 | 784,617 | - | - | - | - | - | - |
$22,440 784,617 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $121,511 Cost: $243,073 |
$121,511 | 4,248,641 | - | - | - | - | - | - |
$121,511 4,248,641 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $8,210 Cost: $17,150 |
$16,583 | 579,820 | - | - | $(-2,797) | - | $(-5,576) | - |
$16,583 579,820 kWh |
- - MMBtu |
$(-2,797) - $ |
$(-5,576) - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,100 Cost: $500 |
$1,100 | 38,289 | - | - | - | - | - | - |
$1,100 38,289 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $7,716 Cost: $400 |
$6,085 | 212,777 | $1,631 | 234 | - | - | - | - |
$6,085 212,777 kWh |
$1,631 234 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,447 Cost: $3,692 |
$2,447 | 85,560 | - | - | - | - | - | - |
$2,447 85,560 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $165,317 Cost: $270,115 |
$172,059 | 6,015,877 | $1,631 | 234 | $(-2,797) | - | $(-5,576) | - | $172,059 6,015,877 kWh |
$1,631 234 MMBtu |
$(-2,797) - $ |
$(-5,576) - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $157,107 Cost: $252,965 |
$155,476 | 5,436,057 | $1,631 | 234 | - | - | - | - | $155,476 5,436,057 kWh |
$1,631 234 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Ancillary Material Cost | Water Consumption | Electricity Usage | Natural Gas | Ancillary Material Cost | Water Consumption |