IAC logo
IAC Assessment: GT0800
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0800
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2005
Principal Product Hard and Soft Candy
NAICS 311340 - Nonchocolate Confectionery Manufacturing
SIC 2064 - Candy & Other Confectionery Products
Sales $100,000,000-$500,000,000
# of Employees 276
Plant Area (Sq.Ft.) 146,800
Annual Production 32,000,000 Pounds
Production Hrs. Annual 5,880
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $601,678 17,357,760 kWh $0.03
Electricity Demand $414,881 35,814 kW-months/year $11.58
Electricity Fees $18,606 - $ -
Natural Gas $1,097,083 258,522 MMBtu $4.24
TOTAL ENERGY COSTS $2,132,248
RECOMMENDED SAVINGS* $269,648 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $250,217
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$241,590
Cost:
$283,800
$45,570 1,470,000 $30,750 3,000 - - $185,000 - $(-19,730) - $45,570
1,470,000
kWh
$30,750
3,000
kW-months/year
-
-
MMBtu
$185,000
-
$
$(-19,730)
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,617
Cost:
$22,400
$3,731 120,344 $2,886 282 - - - - - - $3,731
120,344
kWh
$2,886
282
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
03: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$2,775
Cost:
$900
- - - - $2,775 511 - - - - -
-
kWh
-
-
kW-months/year
$2,775
511
MMBtu
-
-
$
-
-
Tgal
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$14,900
Cost:
$25,600
- - - - $14,900 2,744 - - - - -
-
kWh
-
-
kW-months/year
$14,900
2,744
MMBtu
-
-
$
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,756
Cost:
$1,785
$1,741 14,717 $15 1 - - - - - - $1,741
14,717
kWh
$15
1
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,010
Cost:
$850
$1,200 38,714 $810 17 - - - - - - $1,200
38,714
kWh
$810
17
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$269,648
Cost:
$335,335
$52,242 1,643,775 $34,461 3,300 $17,675 3,255 $185,000 - $(-19,730) - $52,242
1,643,775
kWh
$34,461
3,300
kW-months/year
$17,675
3,255
MMBtu
$185,000
-
$
$(-19,730)
-
Tgal
TOTAL IMPLEMENTED Savings:
$250,217
Cost:
$307,050
$50,501 1,629,058 $34,446 3,299 - - $185,000 - $(-19,730) - $50,501
1,629,058
kWh
$34,446
3,299
kW-months/year
-
-
MMBtu
$185,000
-
$
$(-19,730)
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption