Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2005 |
Principal Product | Engine Valves |
NAICS | 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing |
SIC | 3592 - Carburetors, Pistons, Rings, Valves |
Sales | $50,000,000-$100,000,000 |
# of Employees | 330 |
Plant Area (Sq.Ft.) | 148,391 |
Annual Production | 46,000,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | SC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $557,299 | 24,230,400 | kWh | $0.02 |
Electricity Demand | $372,908 | 39,984 | kW-months/year | $9.33 |
Electricity Fees | $402 | - | $ | - |
Natural Gas | $417,296 | 43,536 | MMBtu | $9.59 |
TOTAL ENERGY COSTS | $1,347,905 | |||
RECOMMENDED SAVINGS* | $134,867 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,228 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $30,000 Cost: - |
- | - | - | - | - | - | $30,000 | 800,000 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$30,000 800,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $20,000 Cost: - |
- | - | - | - | - | - | $20,000 | 200,000 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$20,000 200,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $26,359 Cost: $9,400 |
$16,445 | 715,000 | $9,914 | 1,192 | - | - | - | - |
$16,445 715,000 kWh |
$9,914 1,192 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $11,228 Cost: $6,378 |
$7,005 | 304,560 | $4,223 | 508 | - | - | - | - |
$7,005 304,560 kWh |
$4,223 508 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,562 Cost: $7,239 |
$4,986 | 216,770 | $2,576 | 310 | - | - | - | - |
$4,986 216,770 kWh |
$2,576 310 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $7,399 Cost: $7,301 |
- | - | - | - | $7,399 | 771 | - | - |
- - kWh |
- - kW-months/year |
$7,399 771 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $7,167 Cost: $14,160 |
$4,471 | 194,400 | $2,696 | 324 | - | - | - | - |
$4,471 194,400 kWh |
$2,696 324 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $25,152 Cost: $62,500 |
$11,196 | 486,765 | $13,956 | 1,677 | - | - | - | - |
$11,196 486,765 kWh |
$13,956 1,677 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $134,867 Cost: $106,978 |
$44,103 | 1,917,495 | $33,365 | 4,011 | $7,399 | 771 | $50,000 | 1,000,000 | $44,103 1,917,495 kWh |
$33,365 4,011 kW-months/year |
$7,399 771 MMBtu |
$50,000 1,000,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,228 Cost: $6,378 |
$7,005 | 304,560 | $4,223 | 508 | - | - | - | - | $7,005 304,560 kWh |
$4,223 508 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |