IAC Assessment: GT0817
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0817
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2006
Principal Product Industrial Fabric for Conveyer Belts
NAICS 314999 - All Other Miscellaneous Textile Product Mills
SIC 2299 - Textile Goods, Nec
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 500,000
Annual Production 21,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $404,537 10,211,082 kWh $0.04
Electricity Demand $80,557 18,207 kW-months/year $4.42
Electricity Fees $67,169 - $ -
Natural Gas $332,449 30,291 MMBtu $10.98
TOTAL ENERGY COSTS $884,712
RECOMMENDED SAVINGS* $103,907 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,299
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$8,981
Cost:
$1,333
$8,981 252,288 - - - - - - $8,981
252,288
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$40,933
Cost:
$164,201
$30,883 664,148 $10,050 912 - - - - $30,883
664,148
kWh
$10,050
912
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,177
Cost:
$9,625
$9,233 247,557 $1,944 176 - - - - $9,233
247,557
kWh
$1,944
176
kW-months/year
-
-
$
-
-
MMBtu
04: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$3,469
Cost:
$7,920
$3,469 97,445 - - - - - - $3,469
97,445
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,652
Cost:
$500
$2,652 74,481 - - - - - - $2,652
74,481
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,666
Cost:
$1,500
$2,666 74,880 - - - - - - $2,666
74,880
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$32,042
Cost:
$15,000
- - - - - - $32,042 2,919 -
-
kWh
-
-
kW-months/year
-
-
$
$32,042
2,919
MMBtu
08: 2.8112 COMBINE UTILITY METERS Savings:
$1,987
Cost:
-
- - - - $1,987 - - - -
-
kWh
-
-
kW-months/year
$1,987
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$103,907
Cost:
$200,079
$57,884 1,410,799 $11,994 1,088 $1,987 - $32,042 2,919 $57,884
1,410,799
kWh
$11,994
1,088
kW-months/year
$1,987
-
$
$32,042
2,919
MMBtu
TOTAL IMPLEMENTED Savings:
$14,299
Cost:
$3,333
$14,299 401,649 - - - - - - $14,299
401,649
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas