IAC logo
IAC Assessment: GT0821
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0821
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2006
Principal Product Glass and Ceramic Components
NAICS 327215 - Glass Product Manufacturing Made of Purchased Glass
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 90,000
Annual Production 1,000,000,000 Pieces
Production Hrs. Annual 2,080
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,072 4,040,072 kWh $0.03
Electricity Demand $26,429 6,175 kW-months/year $4.28
Natural Gas $114,192 14,976 MMBtu $7.63
TOTAL ENERGY COSTS $248,693
RECOMMENDED SAVINGS* $80,705 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,516
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$19,168
Cost:
-
$19,168 716,560 - - - - - - $19,168
716,560
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$5,498
Cost:
$10,883
- - - - $5,498 - - - -
-
kWh
-
-
kW-months/year
$5,498
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,292
Cost:
$6,787
$988 36,940 $304 71 - - - - $988
36,940
kWh
$304
71
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$274
Cost:
$172
$165 6,183 $109 25 - - - - $165
6,183
kWh
$109
25
kW-months/year
-
-
$
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$41,364
Cost:
$117,000
$(-5,884) (-220,000) $(-3,766) (-881) - - $51,014 6,860 $(-5,884)
(-220,000)
kWh
$(-3,766)
(-881)
kW-months/year
-
-
$
$51,014
6,860
MMBtu
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$7,286
Cost:
$800
$5,570 208,232 $1,716 401 - - - - $5,570
208,232
kWh
$1,716
401
kW-months/year
-
-
$
-
-
MMBtu
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,327
Cost:
$4,500
$4,073 152,256 $1,254 293 - - - - $4,073
152,256
kWh
$1,254
293
kW-months/year
-
-
$
-
-
MMBtu
08: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$496
Cost:
$1,050
$496 18,501 - - - - - - $496
18,501
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$80,705
Cost:
$141,192
$24,576 918,672 $(-383) (-91) $5,498 - $51,014 6,860 $24,576
918,672
kWh
$(-383)
(-91)
kW-months/year
$5,498
-
$
$51,014
6,860
MMBtu
TOTAL IMPLEMENTED Savings:
$28,516
Cost:
$8,809
$26,387 986,416 $2,129 497 - - - - $26,387
986,416
kWh
$2,129
497
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas