IAC logo
IAC Assessment: GT0831
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0831
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2006
Principal Product Plastic Packaging
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 130,000
Annual Production 20,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $592,129 23,404,319 kWh $0.03
Electricity Demand $538,502 45,869 kW-months/year $11.74
Electricity Fees $95,190 - $ -
TOTAL ENERGY COSTS $1,225,821
RECOMMENDED SAVINGS* $74,335 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Consumption Electricity Usage Electricity Demand Water Consumption
$ kWh $ kW-months/year $ Tgal
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,755
Cost:
-
$2,779 109,839 $1,976 176 - - $2,779
109,839
kWh
$1,976
176
kW-months/year
-
-
Tgal
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$3,017
Cost:
-
$1,767 69,826 $1,250 112 - - $1,767
69,826
kWh
$1,250
112
kW-months/year
-
-
Tgal
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,388
Cost:
$250
$1,460 57,692 $928 83 - - $1,460
57,692
kWh
$928
83
kW-months/year
-
-
Tgal
04: 3.4151 MINIMIZE WATER USAGE Savings:
$17,245
Cost:
$1,500
- - - - $17,245 - -
-
kWh
-
-
kW-months/year
$17,245
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,441
Cost:
$7,500
$10,762 425,388 $7,679 685 - - $10,762
425,388
kWh
$7,679
685
kW-months/year
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,679
Cost:
$3,100
$2,152 85,064 $1,527 136 - - $2,152
85,064
kWh
$1,527
136
kW-months/year
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,785
Cost:
$14,000
$8,774 346,801 $3,011 269 - - $8,774
346,801
kWh
$3,011
269
kW-months/year
-
-
Tgal
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$7,077
Cost:
-
$2,103 83,117 $4,974 444 - - $2,103
83,117
kWh
$4,974
444
kW-months/year
-
-
Tgal
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,948
Cost:
$3,898
$2,494 98,578 $3,454 308 - - $2,494
98,578
kWh
$3,454
308
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$74,335
Cost:
$30,248
$32,291 1,276,305 $24,799 2,213 $17,245 - $32,291
1,276,305
kWh
$24,799
2,213
kW-months/year
$17,245
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Consumption Electricity Usage Electricity Demand Water Consumption