IAC Assessment: GT0832
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2006
Principal Product Frozen Food
NAICS 311412 - Frozen Specialty Food Manufacturing
SIC 2038 - Frozen Specialties, Nec
Sales $50,000,000-$100,000,000
# of Employees 290
Plant Area (Sq.Ft.) 208,000
Annual Production 95,000,000 Pieces
Production Hrs. Annual 6,864
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,578,449 28,142,440 kWh $0.06
Electricity Demand $430 27 kW-months/year $15.93
Electricity Fees $91 - $ -
Natural Gas $605,892 49,247 MMBtu $12.30
TOTAL ENERGY COSTS $2,184,862
RECOMMENDED SAVINGS* $166,975 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $100,548
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,160
Cost:
$1,250
$12,160 196 - - - - $12,160
196
kWh
-
-
MMBtu
-
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$6,843
Cost:
-
$6,843 110,542 - - - - $6,843
110,542
kWh
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,559
Cost:
$45,000
$14,559 235,210 - - - - $14,559
235,210
kWh
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$21,105
Cost:
-
- - $22,755 1,850 $(-1,650) - -
-
kWh
$22,755
1,850
MMBtu
$(-1,650)
-
$
05: 2.8112 COMBINE UTILITY METERS Savings:
$7,574
Cost:
$14,018
- - - - $7,574 - -
-
kWh
-
-
MMBtu
$7,574
-
$
06: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$40,180
Cost:
$30,000
- - $40,180 3,265 - - -
-
kWh
$40,180
3,265
MMBtu
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$43,862
Cost:
$20,449
$43,862 708,600 - - - - $43,862
708,600
kWh
-
-
MMBtu
-
-
$
08: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$11,830
Cost:
$36,750
- - - - $11,830 - -
-
kWh
-
-
MMBtu
$11,830
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,862
Cost:
$47,168
$8,862 143,162 - - - - $8,862
143,162
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$166,975
Cost:
$194,635
$86,286 1,197,710 $62,935 5,115 $17,754 - $86,286
1,197,710
kWh
$62,935
5,115
MMBtu
$17,754
-
$
TOTAL IMPLEMENTED Savings:
$100,548
Cost:
$113,867
$79,443 1,087,168 $22,755 1,850 $(-1,650) - $79,443
1,087,168
kWh
$22,755
1,850
MMBtu
$(-1,650)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes