IAC Assessment: GT0833
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0833
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2006
Principal Product Automotive Exterior Parts
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $100,000,000-$500,000,000
# of Employees 650
Plant Area (Sq.Ft.) 310,000
Annual Production 1,200,000 Pieces
Production Hrs. Annual 7,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,185,270 46,559,211 kWh $0.05
Electricity Demand $261,920 73,097 kW-months/year $3.58
Electricity Fees $173,850 - $ -
Natural Gas $1,903,922 159,982 MMBtu $11.90
TOTAL ENERGY COSTS $4,524,962
RECOMMENDED SAVINGS* $1,100,621 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,604
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ MMBtu $ lb $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$870,069
Cost:
$100,000
- - $870,069 73,115 - - - - -
-
kWh
$870,069
73,115
MMBtu
-
-
lb
-
-
$
02: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$137,445
Cost:
-
- - $137,445 11,550 - - - - -
-
kWh
$137,445
11,550
MMBtu
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,153
Cost:
-
$9,153 167,637 - - - - - - $9,153
167,637
kWh
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$9,806
Cost:
$18,000
$9,806 179,600 - - - - - - $9,806
179,600
kWh
-
-
MMBtu
-
-
lb
-
-
$
05: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$29,400
Cost:
-
- - - - $29,400 120,000 - - -
-
kWh
-
-
MMBtu
$29,400
120,000
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,653
Cost:
$550
$1,653 30,275 - - - - - - $1,653
30,275
kWh
-
-
MMBtu
-
-
lb
-
-
$
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$6,204
Cost:
-
- - - - - - $6,204 - -
-
kWh
-
-
MMBtu
-
-
lb
$6,204
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$36,891
Cost:
$62,250
$36,891 675,659 - - - - - - $36,891
675,659
kWh
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$1,100,621
Cost:
$180,800
$57,503 1,053,171 $1,007,514 84,665 $29,400 120,000 $6,204 - $57,503
1,053,171
kWh
$1,007,514
84,665
MMBtu
$29,400
120,000
lb
$6,204
-
$
TOTAL IMPLEMENTED Savings:
$35,604
Cost:
-
- - - - $29,400 120,000 $6,204 - -
-
kWh
-
-
MMBtu
$29,400
120,000
lb
$6,204
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes