IAC logo
IAC Assessment: GT0837
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0837
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2007
Principal Product Jail Modules
NAICS 327390 - Other Concrete Product Manufacturing
SIC 3272 - Concrete Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 343
Plant Area (Sq.Ft.) 127,000
Annual Production 1,250 Pieces
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,742 2,867,140 kWh $0.05
Electricity Demand $90,596 5,925 kW-months/year $15.29
Electricity Fees $1,053 - $ -
Natural Gas $464,736 55,034 MMBtu $8.44
TOTAL ENERGY COSTS $687,127
RECOMMENDED SAVINGS* $132,390 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $102,272
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,990
Cost:
-
$4,990 109,400 - - - - - - - - $4,990
109,400
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,300
Cost:
$3,250
$18,300 401,968 - - - - - - - - $18,300
401,968
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$14,528
Cost:
$1,800
- - - - $13,961 1,655 $567 138,292 - - -
-
kWh
-
-
kW-months/year
$13,961
1,655
MMBtu
$567
138,292
Tgal
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$47,920
Cost:
-
- - - - $47,920 5,796 - - - - -
-
kWh
-
-
kW-months/year
$47,920
5,796
MMBtu
-
-
Tgal
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$13,963
Cost:
-
- - - - - - - - $13,963 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$13,963
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,571
Cost:
$7,090
$1,764 38,660 $807 53 - - - - - - $1,764
38,660
kWh
$807
53
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30,118
Cost:
$41,616
$21,586 472,968 $8,532 558 - - - - - - $21,586
472,968
kWh
$8,532
558
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$132,390
Cost:
$53,756
$46,640 1,022,996 $9,339 611 $61,881 7,451 $567 138,292 $13,963 - $46,640
1,022,996
kWh
$9,339
611
kW-months/year
$61,881
7,451
MMBtu
$567
138,292
Tgal
$13,963
-
$
TOTAL IMPLEMENTED Savings:
$102,272
Cost:
$12,140
$25,054 550,028 $807 53 $61,881 7,451 $567 138,292 $13,963 - $25,054
550,028
kWh
$807
53
kW-months/year
$61,881
7,451
MMBtu
$567
138,292
Tgal
$13,963
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes