Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2007 |
Principal Product | Rubber Backed Floor Mats |
NAICS | 314110 - Carpet and Rug Mills |
SIC | 2273 - Carpets And Rugs |
Sales | $50,000,000-$100,000,000 |
# of Employees | 240 |
Plant Area (Sq.Ft.) | 190,000 |
Annual Production | 41,400 Thousand Feet |
Production Hrs. Annual | 6,864 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $100,306 | 2,865,872 | kWh | $0.04 |
Electricity Demand | $109,609 | 6,172 | kW-months/year | $17.76 |
Natural Gas | $473,220 | 53,676 | MMBtu | $8.82 |
TOTAL ENERGY COSTS | $683,135 | |||
RECOMMENDED SAVINGS* | $114,705 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $25,825 Cost: $10,000 |
$13,685 | 391,008 | $12,140 | 684 | - | - | - | - | - | - |
$13,685 391,008 kWh |
$12,140 684 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2212 USE MINIMUM SAFE OVEN VENTILATION |
Savings: $5,955 Cost: $6,000 |
$178 | 5,088 | $141 | 8 | $5,636 | 612 | - | - | - | - |
$178 5,088 kWh |
$141 8 kW-months/year |
$5,636 612 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $7,976 Cost: - |
- | - | - | - | $7,976 | 766 | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,976 766 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $3,908 Cost: - |
- | - | - | - | $4,808 | 522 | - | - | $(-900) | - |
- - kWh |
- - kW-months/year |
$4,808 522 MMBtu |
- - Tgal |
$(-900) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $17,020 Cost: - |
- | - | - | - | $17,020 | 1,848 | - | - | - | - |
- - kWh |
- - kW-months/year |
$17,020 1,848 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN |
Savings: $1,288 Cost: $3,975 |
- | - | - | - | $1,050 | 114 | $238 | 39,000 | - | - |
- - kWh |
- - kW-months/year |
$1,050 114 MMBtu |
$238 39,000 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $2,338 Cost: $2,250 |
$2,338 | 66,792 | - | - | - | - | - | - | - | - |
$2,338 66,792 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $39,896 Cost: $127,725 |
$21,141 | 604,032 | $18,755 | 1,056 | - | - | - | - | - | - |
$21,141 604,032 kWh |
$18,755 1,056 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,159 Cost: $17,436 |
$4,323 | 123,552 | $3,836 | 216 | - | - | - | - | - | - |
$4,323 123,552 kWh |
$3,836 216 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,340 Cost: $2,004 |
- | - | - | - | $2,340 | 254 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,340 254 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $114,705 Cost: $169,390 |
$41,665 | 1,190,472 | $34,872 | 1,964 | $38,830 | 4,116 | $238 | 39,000 | $(-900) | - | $41,665 1,190,472 kWh |
$34,872 1,964 kW-months/year |
$38,830 4,116 MMBtu |
$238 39,000 Tgal |
$(-900) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes |