IAC Assessment: GT0845
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0845
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2007
Principal Product Gas Regulation Equipment
NAICS 333992 - Welding and Soldering Equipment Manufacturing
SIC 3548 - Welding Apparatus
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 86,000
Annual Production 2,600,000 Pieces
Production Hrs. Annual 6,262
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $182,663 3,886,449 kWh $0.05
Electricity Demand $137,443 8,047 kW-months/year $17.08
Electricity Fees $1,931 - $ -
Natural Gas $2,731 213 MMBtu $12.82
TOTAL ENERGY COSTS $324,768
RECOMMENDED SAVINGS* $88,269 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,505
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,571
Cost:
$31,022
$10,660 225,202 $6,911 432 - - - - $10,660
225,202
kWh
$6,911
432
kW-months/year
-
-
$
-
-
MMBtu
02: 2.8112 COMBINE UTILITY METERS Savings:
$6,697
Cost:
-
- - - - $6,697 - - - -
-
kWh
-
-
kW-months/year
$6,697
-
$
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,196
Cost:
-
$1,294 27,537 $902 53 - - - - $1,294
27,537
kWh
$902
53
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$22,129
Cost:
$26,550
$198 4,217 $21,931 1,284 - - - - $198
4,217
kWh
$21,931
1,284
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$8,290
Cost:
$4,750
$6,683 141,629 - - - - $1,607 125 $6,683
141,629
kWh
-
-
kW-months/year
-
-
$
$1,607
125
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$24,215
Cost:
$2,000
$14,274 303,707 $9,941 582 - - - - $14,274
303,707
kWh
$9,941
582
kW-months/year
-
-
$
-
-
MMBtu
07: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$3,956
Cost:
$4,000
$3,956 84,171 - - - - - - $3,956
84,171
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,215
Cost:
$3,600
$3,215 67,392 - - - - - - $3,215
67,392
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$88,269
Cost:
$71,922
$40,280 853,855 $39,685 2,351 $6,697 - $1,607 125 $40,280
853,855
kWh
$39,685
2,351
kW-months/year
$6,697
-
$
$1,607
125
MMBtu
TOTAL IMPLEMENTED Savings:
$32,505
Cost:
$6,750
$20,957 445,336 $9,941 582 - - $1,607 125 $20,957
445,336
kWh
$9,941
582
kW-months/year
-
-
$
$1,607
125
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas