IAC Assessment: GT0856
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2008
Principal Product High Voltage Electrical Switches
NAICS 335313 - Switchgear and Switchboard Apparatus Manufacturing
SIC 3613 - Switchgear And Switchboard Apparatus
Sales $50,000,000-$100,000,000
# of Employees 340
Plant Area (Sq.Ft.) 175,000
Annual Production 17,000 Pieces
Production Hrs. Annual 4,500
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $159,033 3,334,800 kWh $0.05
Electricity Demand $123,636 8,076 kW-months/year $15.31
Electricity Fees $15,627 - $ -
Natural Gas $105,974 10,675 MMBtu $9.93
TOTAL ENERGY COSTS $404,270
RECOMMENDED SAVINGS* $90,381 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $64,976
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$11,537
Cost:
$2,000
- - - - $11,537 1,162 - - -
-
kWh
-
-
kW-months/year
$11,537
1,162
MMBtu
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$9,290
Cost:
$2,000
$9,290 184,875 - - - - - - $9,290
184,875
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$8,620
Cost:
$3,000
- - - - $8,620 868 - - -
-
kWh
-
-
kW-months/year
$8,620
868
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,097
Cost:
$4,500
$16,097 320,089 - - - - $(-5,000) - $16,097
320,089
kWh
-
-
kW-months/year
-
-
MMBtu
$(-5,000)
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,723
Cost:
-
$1,875 37,299 $848 51 - - - - $1,875
37,299
kWh
$848
51
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$8,400
Cost:
$15,000
- - - - $8,400 850 - - -
-
kWh
-
-
kW-months/year
$8,400
850
MMBtu
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$8,385
Cost:
$13,000
- - - - $8,385 845 - - -
-
kWh
-
-
kW-months/year
$8,385
845
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30,329
Cost:
$80,207
$16,098 320,303 $14,231 870 - - - - $16,098
320,303
kWh
$14,231
870
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$90,381
Cost:
$119,707
$43,360 862,566 $15,079 921 $36,942 3,725 $(-5,000) - $43,360
862,566
kWh
$15,079
921
kW-months/year
$36,942
3,725
MMBtu
$(-5,000)
-
$
TOTAL IMPLEMENTED Savings:
$64,976
Cost:
$88,707
$43,360 862,566 $15,079 921 $11,537 1,162 $(-5,000) - $43,360
862,566
kWh
$15,079
921
kW-months/year
$11,537
1,162
MMBtu
$(-5,000)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $