IAC logo
IAC Assessment: GT0873
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0873
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2010
Principal Product Plastic Containers
NAICS 326160 - Plastics Bottle Manufacturing
SIC 3085 - Plastics Bottles
Sales $10,000,000-$50,000,000
# of Employees 53
Plant Area (Sq.Ft.) 200,000
Annual Production 32,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $449,782 7,799,280 kWh $0.06
Natural Gas $45,685 4,154 MMBtu $11.00
TOTAL ENERGY COSTS $495,467
RECOMMENDED SAVINGS* $52,576 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,607
#|Description Savings
Cost
Status Electricity Usage Natural Gas Ancillary Material Cost Electricity Usage Natural Gas Ancillary Material Cost
$ kWh $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,353
Cost:
-
$6,353 105,706 - - - - $6,353
105,706
kWh
-
-
MMBtu
-
-
$
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$10,144
Cost:
$4,600
$10,744 178,767 - - $(-600) - $10,744
178,767
kWh
-
-
MMBtu
$(-600)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,825
Cost:
$19,768
$19,825 329,874 - - - - $19,825
329,874
kWh
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,777
Cost:
$10,640
$3,777 62,842 - - - - $3,777
62,842
kWh
-
-
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$816
Cost:
$4,400
$816 13,574 - - - - $816
13,574
kWh
-
-
MMBtu
-
-
$
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$11,661
Cost:
$775
$973 15,133 $10,688 972 - - $973
15,133
kWh
$10,688
972
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$52,576
Cost:
$40,183
$42,488 705,896 $10,688 972 $(-600) - $42,488
705,896
kWh
$10,688
972
MMBtu
$(-600)
-
$
TOTAL IMPLEMENTED Savings:
$22,607
Cost:
$15,815
$11,919 197,255 $10,688 972 - - $11,919
197,255
kWh
$10,688
972
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Ancillary Material Cost Electricity Usage Natural Gas Ancillary Material Cost