Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2011 |
Principal Product | Automotive Locking Mechanism |
NAICS | 336390 - Other Motor Vehicle Parts Manufacturing |
SIC | 3429 - Hardware, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 440 |
Plant Area (Sq.Ft.) | 325,000 |
Annual Production | 11,900,000 Pieces |
Production Hrs. Annual | 5,880 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $447,590 | 13,514,048 | kWh | $0.03 |
Electricity Demand | $627,820 | 46,402 | kW-months/year | $13.53 |
Electricity Fees | $36,140 | - | $ | - |
Natural Gas | $323,987 | 40,816 | MMBtu | $7.94 |
TOTAL ENERGY COSTS | $1,435,537 | |||
RECOMMENDED SAVINGS* | $250,735 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $126,419 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $13,634 Cost: - |
$18,634 | 562,970 | - | - | - | - | - | - | $(-5,000) | - |
$18,634 562,970 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$(-5,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $7,201 Cost: - |
$7,201 | 217,560 | - | - | - | - | - | - | - | - |
$7,201 217,560 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $28,143 Cost: $70,000 |
$4,601 | 139,010 | $23,542 | 1,740 | - | - | - | - | - | - |
$4,601 139,010 kWh |
$23,542 1,740 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4155 METER WASTE WATER |
Savings: $3,614 Cost: $6,000 |
- | - | - | - | - | - | $3,614 | 790,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,614 790,000 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $16,076 Cost: $55,000 |
$16,076 | 485,673 | - | - | - | - | - | - | - | - |
$16,076 485,673 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $31,792 Cost: $136,000 |
$31,792 | 960,476 | - | - | - | - | - | - | - | - |
$31,792 960,476 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $17,800 Cost: $38,640 |
$17,800 | 537,772 | - | - | - | - | - | - | - | - |
$17,800 537,772 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $85,358 Cost: $222,000 |
$2,671 | 80,706 | - | - | $82,687 | 10,414 | - | - | - | - |
$2,671 80,706 kWh |
- - kW-months/year |
$82,687 10,414 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $47,117 Cost: $155,150 |
$28,283 | 854,462 | $18,834 | 1,392 | - | - | - | - | - | - |
$28,283 854,462 kWh |
$18,834 1,392 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $250,735 Cost: $682,790 |
$127,058 | 3,838,629 | $42,376 | 3,132 | $82,687 | 10,414 | $3,614 | 790,000 | $(-5,000) | - | $127,058 3,838,629 kWh |
$42,376 3,132 kW-months/year |
$82,687 10,414 MMBtu |
$3,614 790,000 Tgal |
$(-5,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $126,419 Cost: $384,790 |
$112,585 | 3,401,353 | $18,834 | 1,392 | - | - | - | - | $(-5,000) | - | $112,585 3,401,353 kWh |
$18,834 1,392 kW-months/year |
- - MMBtu |
- - Tgal |
$(-5,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost |