IAC logo
IAC Assessment: GT0884
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0884
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2011
Principal Product Teabags
NAICS 311920 - Coffee and Tea Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 195
Plant Area (Sq.Ft.) 231,644
Annual Production 32,000,000 Pounds
Production Hrs. Annual 7,500
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $253,268 4,985,600 kWh $0.05
Electricity Demand $181,429 12,167 kW-months/year $14.91
Electricity Fees $30,920 - $ -
TOTAL ENERGY COSTS $465,617
RECOMMENDED SAVINGS* $164,328 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,130
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,890
Cost:
$44,900
$3,330 65,500 $1,560 105 - - $3,330
65,500
kWh
$1,560
105
kW-months/year
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,290
Cost:
$210
$4,290 84,400 - - - - $4,290
84,400
kWh
-
-
kW-months/year
-
-
$
03: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$57,100
Cost:
$361,600
$17,200 339,000 $22,500 1,510 $17,400 - $17,200
339,000
kWh
$22,500
1,510
kW-months/year
$17,400
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,400
Cost:
$600
$7,820 154,000 $3,580 240 - - $7,820
154,000
kWh
$3,580
240
kW-months/year
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$16,610
Cost:
$14,000
$11,300 223,000 $5,310 356 - - $11,300
223,000
kWh
$5,310
356
kW-months/year
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,894
Cost:
$43,550
$1,970 38,800 $924 62 - - $1,970
38,800
kWh
$924
62
kW-months/year
-
-
$
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$29,550
Cost:
$2,000
$20,100 395,000 $9,450 634 - - $20,100
395,000
kWh
$9,450
634
kW-months/year
-
-
$
08: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$31,010
Cost:
$160,650
$21,900 432,000 $9,110 611 - - $21,900
432,000
kWh
$9,110
611
kW-months/year
-
-
$
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,584
Cost:
$37,790
$3,860 76,000 $2,724 190 - - $3,860
76,000
kWh
$2,724
190
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$164,328
Cost:
$665,300
$91,770 1,807,700 $55,158 3,708 $17,400 - $91,770
1,807,700
kWh
$55,158
3,708
kW-months/year
$17,400
-
$
TOTAL IMPLEMENTED Savings:
$50,130
Cost:
$47,710
$35,540 698,900 $14,590 979 - - $35,540
698,900
kWh
$14,590
979
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost