IAC logo
IAC Assessment: GT0885
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0885
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2011
Principal Product Plastic Parts/Assemblies
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 220,000
Annual Production 24,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $846,495 22,101,687 kWh $0.04
Electricity Demand $306,910 30,839 kW-months/year $9.95
Electricity Fees $92,702 - $ -
Natural Gas $2,912 176 MMBtu $16.55
TOTAL ENERGY COSTS $1,249,019
RECOMMENDED SAVINGS* $82,614 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,008
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,060
Cost:
$2,500
$2,247 58,675 $813 82 $2,247
58,675
kWh
$813
82
kW-months/year
02: 2.7122 DISCONNECT BALLASTS Savings:
$635
Cost:
$885
$466 12,166 $169 17 $466
12,166
kWh
$169
17
kW-months/year
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$197
Cost:
$285
$197 5,131 - - $197
5,131
kWh
-
-
kW-months/year
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$582
Cost:
$1,450
$288 7,528 $294 30 $288
7,528
kWh
$294
30
kW-months/year
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$55,071
Cost:
-
$33,336 870,400 $21,735 2,184 $33,336
870,400
kWh
$21,735
2,184
kW-months/year
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,318
Cost:
$8,163
$14,318 373,854 - - $14,318
373,854
kWh
-
-
kW-months/year
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,257
Cost:
$12,880
$3,126 81,627 $1,131 114 $3,126
81,627
kWh
$1,131
114
kW-months/year
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,494
Cost:
$14,600
$3,300 86,160 $1,194 120 $3,300
86,160
kWh
$1,194
120
kW-months/year
TOTAL RECOMMENDED Savings:
$82,614
Cost:
$40,763
$57,278 1,495,541 $25,336 2,547 $57,278
1,495,541
kWh
$25,336
2,547
kW-months/year
TOTAL IMPLEMENTED Savings:
$12,008
Cost:
$30,265
$8,870 231,593 $3,138 316 $8,870
231,593
kWh
$3,138
316
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand