IAC Assessment: GT0891
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0891
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2012
Principal Product FiberCement Boards-Siding
NAICS 327390 - Other Concrete Product Manufacturing
SIC 3272 - Concrete Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 159
Plant Area (Sq.Ft.) 294,500
Annual Production 26,604 Thousand Feet
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,051,708 15,057,818 kWh $0.07
Electricity Demand $63,236 38,209 kW-months/year $1.66
Natural Gas $550,658 100,120 MMBtu $5.50
TOTAL ENERGY COSTS $1,815,198
RECOMMENDED SAVINGS* $114,506 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,839
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$14,552
Cost:
-
$14,552 287,013 - 447 - - - - $14,552
287,013
kWh
-
447
kW-months/year
-
-
MMBtu
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$304
Cost:
-
$304 6,002 - 25 - - - - $304
6,002
kWh
-
25
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$610
Cost:
$225
- - - - $610 111 - - -
-
kWh
-
-
kW-months/year
$610
111
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$625
Cost:
$25,217
$364 6,386 $261 13 - - - - $364
6,386
kWh
$261
13
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$47,301
Cost:
$12,500
$30,785 607,199 $16,516 832 - - - - $30,785
607,199
kWh
$16,516
832
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$34,362
Cost:
$25,440
- - - - $34,362 6,248 - - -
-
kWh
-
-
kW-months/year
$34,362
6,248
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,852
Cost:
$88,000
$2,826 49,572 $2,026 102 - - - - $2,826
49,572
kWh
$2,026
102
kW-months/year
-
-
MMBtu
-
-
$
08: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$3,990
Cost:
$12,300
- - - - $3,990 725 - - -
-
kWh
-
-
kW-months/year
$3,990
725
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,190
Cost:
$12,795
$1,858 32,601 $1,332 67 - - - - $1,858
32,601
kWh
$1,332
67
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,720
Cost:
$20,395
$2,118 37,162 $1,518 76 - - $1,084 - $2,118
37,162
kWh
$1,518
76
kW-months/year
-
-
MMBtu
$1,084
-
$
TOTAL RECOMMENDED Savings:
$114,506
Cost:
$196,872
$52,807 1,025,935 $21,653 1,562 $38,962 7,084 $1,084 - $52,807
1,025,935
kWh
$21,653
1,562
kW-months/year
$38,962
7,084
MMBtu
$1,084
-
$
TOTAL IMPLEMENTED Savings:
$39,839
Cost:
$138,657
$3,190 55,958 $2,287 115 $34,362 6,248 - - $3,190
55,958
kWh
$2,287
115
kW-months/year
$34,362
6,248
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes