IAC logo
IAC Assessment: GT0909
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0909
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2017
Principal Product Flexible packaging
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 100,000
Annual Production 5,041,183 Pounds
Production Hrs. Annual 8,570
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $635,613 7,310,052 kWh $0.09
Natural Gas $4,806 486 MMBtu $9.89
TOTAL ENERGY COSTS $640,418
RECOMMENDED SAVINGS* $109,601 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $99,093
#|Description Savings
Cost
Status Electricity Usage Primary Product Electricity Usage Primary Product
$ kWh $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,363
Cost:
$240
$3,363 38,659 - - $3,363
38,659
kWh
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,594
Cost:
$411
$1,594 18,323 - - $1,594
18,323
kWh
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$49,255
Cost:
$36,180
$49,255 566,149 - - $49,255
566,149
kWh
-
-
$
04: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$5,551
Cost:
$7,915
$5,551 63,807 - - $5,551
63,807
kWh
-
-
$
05: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$49,838
Cost:
$321,120
$(-4,210) (-48,385) $54,048 - $(-4,210)
(-48,385)
kWh
$54,048
-
$
TOTAL RECOMMENDED Savings:
$109,601
Cost:
$365,866
$55,553 638,553 $54,048 - $55,553
638,553
kWh
$54,048
-
$
TOTAL IMPLEMENTED Savings:
$99,093
Cost:
$357,300
$45,045 517,764 $54,048 - $45,045
517,764
kWh
$54,048
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Primary Product Electricity Usage Primary Product