IAC logo
IAC Assessment: GT0924
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0924
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2019
Principal Product RTV, Compact Tractor, Zero-Turn Mower
NAICS 333111 - Farm Machinery and Equipment Manufacturing
SIC 3523 - Farm Machinery And Equipment
Sales >$500,000,000
# of Employees 2,000
Plant Area (Sq.Ft.) 1,179,000
Annual Production 120,894 Pieces
Production Hrs. Annual 2,600
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,362,220 41,456,468 kWh $0.06
Natural Gas $1,073,277 203,385 MMBtu $5.28
TOTAL ENERGY COSTS $3,435,497
RECOMMENDED SAVINGS* $218,412 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,479
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,068
Cost:
$3,500
$16,068 281,901 - - $16,068
281,901
kWh
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,338
Cost:
$6,225
- - $7,338 1,390 -
-
kWh
$7,338
1,390
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,577
Cost:
$13,969
$5,577 97,843 - - $5,577
97,843
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,833
Cost:
$79,937
$14,833 260,235 - - $14,833
260,235
kWh
-
-
MMBtu
05: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$174,595
Cost:
$1,725,000
$299,250 5,250,000 $(-124,655) (-23,609) $299,250
5,250,000
kWh
$(-124,655)
(-23,609)
MMBtu
TOTAL RECOMMENDED Savings:
$218,412
Cost:
$1,828,631
$335,729 5,889,979 $(-117,317) (-22,219) $335,729
5,889,979
kWh
$(-117,317)
(-22,219)
MMBtu
TOTAL IMPLEMENTED Savings:
$36,479
Cost:
$97,406
$36,479 639,979 - - $36,479
639,979
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas