IAC logo
IAC Assessment: GT0925
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0925
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2019
Principal Product Metal Coating and Architectural Fabrication
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $5,000,000-$10,000,000
# of Employees 53
Plant Area (Sq.Ft.) 75,000
Annual Production 1,227,383 Pieces
Production Hrs. Annual 2,860
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,051 641,880 kWh $0.11
Electricity Demand $2,332 283 kW-months/year $8.24
Natural Gas $55,219 12,172 MMBtu $4.54
TOTAL ENERGY COSTS $125,602
RECOMMENDED SAVINGS* $29,232 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,966
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$16,903
Cost:
$6,764
- - - - $16,903 3,723 -
-
kWh
-
-
kW-months/year
$16,903
3,723
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,524
Cost:
$1,100
$1,271 11,987 $253 31 - - $1,271
11,987
kWh
$253
31
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,005
Cost:
$3,500
$1,952 18,415 $53 6 - - $1,952
18,415
kWh
$53
6
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,266
Cost:
$9,527
$5,126 48,363 $139 17 - - $5,126
48,363
kWh
$139
17
kW-months/year
-
-
MMBtu
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,177
Cost:
$2,167
$1,177 11,102 - - - - $1,177
11,102
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,358
Cost:
$8,787
$2,399 22,635 $(-41) (-5) - - $2,399
22,635
kWh
$(-41)
(-5)
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$29,232
Cost:
$31,845
$11,925 112,502 $404 49 $16,903 3,723 $11,925
112,502
kWh
$404
49
kW-months/year
$16,903
3,723
MMBtu
TOTAL IMPLEMENTED Savings:
$7,966
Cost:
$12,794
$7,574 71,452 $392 48 - - $7,574
71,452
kWh
$392
48
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas