IAC logo
IAC Assessment: GT0927
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0927
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2019
Principal Product Fire Retardant Additives
NAICS 327992 - Ground or Treated Mineral and Earth Manufacturing
SIC 3295 - Minerals, Ground Or Treated
Sales $50,000,000-$100,000,000
# of Employees 85
Plant Area (Sq.Ft.) 144,000
Annual Production 123,426 Tons
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,590,231 27,821,968 kWh $0.06
Natural Gas $544,739 132,533 MMBtu $4.11
TOTAL ENERGY COSTS $2,134,970
RECOMMENDED SAVINGS* $451,707 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $81,198
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$32,534
Cost:
$4,145
$32,534 570,765 - - $32,534
570,765
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,930
Cost:
$2,500
$7,930 139,131 - - $7,930
139,131
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$35,382
Cost:
$27,983
$35,382 620,734 - - $35,382
620,734
kWh
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,352
Cost:
$6,398
- - $5,352 1,302 -
-
kWh
$5,352
1,302
MMBtu
05: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$308,141
Cost:
$1,725,000
$456,000 8,000,000 $(-147,859) (-35,975) $456,000
8,000,000
kWh
$(-147,859)
(-35,975)
MMBtu
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$62,369
Cost:
$548,847
$62,369 1,091,187 - - $62,369
1,091,187
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$451,707
Cost:
$2,314,873
$594,215 10,421,817 $(-142,508) (-34,673) $594,215
10,421,817
kWh
$(-142,508)
(-34,673)
MMBtu
TOTAL IMPLEMENTED Savings:
$81,198
Cost:
$41,026
$75,846 1,330,630 $5,352 1,302 $75,846
1,330,630
kWh
$5,352
1,302
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas