IAC logo
IAC Assessment: GT0938
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0938
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2019
Principal Product Staple Fibers
NAICS 325220 - Artificial and Synthetic Fibers and Filaments Manufacturing
SIC 2823 - Cellulosic Manmade Fibers
Sales $50,000,000-$100,000,000
# of Employees 83
Plant Area (Sq.Ft.) 130,000
Annual Production 26,809,383 Tons
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,294,988 25,439,632 kWh $0.05
Natural Gas $226,940 50,362 MMBtu $4.51
TOTAL ENERGY COSTS $1,521,928
RECOMMENDED SAVINGS* $45,527 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,255
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$14,349
Cost:
$2,000
- - $14,349 - - - -
-
kWh
$14,349
-
$
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,092
Cost:
$3,500
$16,092 315,526 - - - - $16,092
315,526
kWh
-
-
$
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,868
Cost:
$1,016
$90 1,762 - - $1,779 394 $90
1,762
kWh
-
-
$
$1,779
394
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,814
Cost:
$18,557
$12,814 251,254 - - - - $12,814
251,254
kWh
-
-
$
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$190
Cost:
$512
$190 3,719 - - - - $190
3,719
kWh
-
-
$
-
-
MMBtu
06: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$213
Cost:
$590
$213 4,181 - - - - $213
4,181
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$45,527
Cost:
$26,175
$29,399 576,442 $14,349 - $1,779 394 $29,399
576,442
kWh
$14,349
-
$
$1,779
394
MMBtu
TOTAL IMPLEMENTED Savings:
$43,255
Cost:
$24,057
$28,906 566,780 $14,349 - - - $28,906
566,780
kWh
$14,349
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas