IAC logo
IAC Assessment: GT0952
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0952
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2020
Principal Product Lighting
NAICS 335129 - Other Lighting Equipment Manufacturing
SIC 3648 - Lighting Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 750,000
Annual Production 1,700,000 Units
Production Hrs. Annual 7,500
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $756,812 8,485,134 kWh $0.09
Natural Gas $77,183 14,836 MMBtu $5.20
TOTAL ENERGY COSTS $833,995
RECOMMENDED SAVINGS* $91,290 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,499
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Personnel Changes Electricity Usage Electricity Fees Personnel Changes
$ kWh $ $ $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$11,232
Cost:
$200
$11,232 125,927 - - - - $11,232
125,927
kWh
-
-
$
-
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$53,832
Cost:
$2,000
- - $53,832 - - - -
-
kWh
$53,832
-
$
-
-
$
03: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$304
Cost:
$13
$304 3,411 - - - - $304
3,411
kWh
-
-
$
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,488
Cost:
$300
$4,488 50,316 - - - - $4,488
50,316
kWh
-
-
$
-
-
$
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$5,728
Cost:
$400
- - $5,728 - - - -
-
kWh
$5,728
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,379
Cost:
$1,850
$6,279 70,398 - - $(-2,900) - $6,279
70,398
kWh
-
-
$
$(-2,900)
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,264
Cost:
$1,734
$1,264 14,198 - - - - $1,264
14,198
kWh
-
-
$
-
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$10,763
Cost:
$18,887
$10,763 120,931 - - - - $10,763
120,931
kWh
-
-
$
-
-
$
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$300
Cost:
$1,565
- - $300 - - - -
-
kWh
$300
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$91,290
Cost:
$26,949
$34,330 385,181 $59,861 - $(-2,900) - $34,330
385,181
kWh
$59,861
-
$
$(-2,900)
-
$
TOTAL IMPLEMENTED Savings:
$74,499
Cost:
$6,097
$23,567 264,250 $53,832 - $(-2,900) - $23,567
264,250
kWh
$53,832
-
$
$(-2,900)
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Electricity Fees Personnel Changes Electricity Usage Electricity Fees Personnel Changes