IAC logo
IAC Assessment: GT0974
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0974
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2024
Principal Product Refrigerators/Coolers
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 140,000
Annual Production 1,000,000 Units
Production Hrs. Annual 2,500
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,404 820,800 kWh $0.12
TOTAL ENERGY COSTS $102,404
RECOMMENDED SAVINGS* $56,850 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Electricity Usage Personnel Changes
$ kWh $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,361
Cost:
$200
$1,361 10,891 - - $1,361
10,891
kWh
-
-
$
02: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$1,006
Cost:
$180
$1,006 8,051 - - $1,006
8,051
kWh
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,209
Cost:
$400
$2,209 17,669 - - $2,209
17,669
kWh
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,774
Cost:
$1,850
$8,674 69,390 $(-2,900) - $8,674
69,390
kWh
$(-2,900)
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,870
Cost:
$2,400
$5,870 46,960 - - $5,870
46,960
kWh
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,067
Cost:
$2,139
$2,067 16,533 - - $2,067
16,533
kWh
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,466
Cost:
$6,640
$4,466 35,729 - - $4,466
35,729
kWh
-
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,751
Cost:
$3,150
$1,751 14,009 - - $1,751
14,009
kWh
-
-
$
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$32,346
Cost:
$469,616
$32,346 259,266 - - $32,346
259,266
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$56,850
Cost:
$486,575
$59,750 478,498 $(-2,900) - $59,750
478,498
kWh
$(-2,900)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Personnel Changes Electricity Usage Personnel Changes