IAC logo
IAC Assessment: HO0039
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0039
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1993
Principal Product Thermocouple Temperature Probes
NAICS n/a
SIC 3823 - Process Control Instruments
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 12,000
Annual Production 41,000 Pieces
Production Hrs. Annual 2,250
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,966 189,332 kWh $0.14
Natural Gas $4,089 662 MMBtu $6.18
TOTAL ENERGY COSTS $30,055
RECOMMENDED SAVINGS* $4,758 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,561
Cost:
$1,262
$2,561 18,757 - - $2,561
18,757
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$284
Cost:
$674
$284 2,052 - - $284
2,052
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$53
Cost:
$200
$53 293 - - $53
293
kWh
-
-
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$28
Cost:
$99
- - $28 5 -
-
kWh
$28
5
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,224
Cost:
$4,000
$1,580 13,482 $(-356) (-58) $1,580
13,482
kWh
$(-356)
(-58)
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$608
Cost:
$400
$608 4,396 - - $608
4,396
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$4,758
Cost:
$6,635
$5,086 38,980 $(-328) (-53) $5,086
38,980
kWh
$(-328)
(-53)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas