IAC logo
IAC Assessment: HO0144
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0144
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1997
Principal Product Theatrical scenery
NAICS n/a
SIC 3999 - Manufacturing Industries, Nec
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 230,000
Annual Production 624 Pieces
Production Hrs. Annual 8,760
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $254,648 2,798,652 kWh $0.09
Electricity Demand $237,832 10,960 kW-months/year $21.70
Natural Gas $16,605 2,162 MMBtu $7.68
TOTAL ENERGY COSTS $509,085
RECOMMENDED SAVINGS* $49,011 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,548
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,645
Cost:
$4,563
$7,121 82,356 $3,524 144 - - - - - - - - $7,121
82,356
kWh
$3,524
144
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$9,208
Cost:
$1,900
- - - - $9,208 1,199 - - - - - - -
-
kWh
-
-
kW-months/year
$9,208
1,199
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,903
Cost:
$1,800
$1,419 16,413 $484 22 - - - - - - - - $1,419
16,413
kWh
$484
22
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 3.4151 MINIMIZE WATER USAGE Savings:
$3,510
Cost:
$2,718
- - - - - - $3,510 1,080,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,510
1,080,000
Tgal
-
-
lb
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$20,000
Cost:
$75,000
- - - - - - - - $20,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$20,000
-
lb
-
-
$
06: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$3,745
Cost:
$4,500
- - - - - - - - - - $3,745 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$3,745
-
$
TOTAL RECOMMENDED Savings:
$49,011
Cost:
$90,481
$8,540 98,769 $4,008 166 $9,208 1,199 $3,510 1,080,000 $20,000 - $3,745 - $8,540
98,769
kWh
$4,008
166
kW-months/year
$9,208
1,199
MMBtu
$3,510
1,080,000
Tgal
$20,000
-
lb
$3,745
-
$
TOTAL IMPLEMENTED Savings:
$12,548
Cost:
$6,363
$8,540 98,769 $4,008 166 - - - - - - - - $8,540
98,769
kWh
$4,008
166
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes