IAC logo
IAC Assessment: HO0146
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0146
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1997
Principal Product Powder coating
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 15,000
Annual Production 50,000 Pounds
Production Hrs. Annual 4,160
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $17,471 178,781 kWh $0.10
Electricity Demand $8,887 800 kW-months/year $11.11
Electricity Fees $1,862 - $ -
Natural Gas $63,328 7,790 MMBtu $8.13
TOTAL ENERGY COSTS $96,348
RECOMMENDED SAVINGS* $192,841 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $175,203
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$238
Cost:
$234
$238 2,345 - - - - - - - - - - $238
2,345
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$616
Cost:
$500
$318 2,638 $298 27 - - - - - - - - $318
2,638
kWh
$298
27
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,400
Cost:
$6,500
- - - - - - $2,400 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,400
-
lb
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$16,827
Cost:
$7,700
- - - - $16,827 2,070 - - - - - - -
-
kWh
-
-
kW-months/year
$16,827
2,070
MMBtu
-
-
lb
-
-
$
-
-
$
05: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$15,000
Cost:
$200
- - - - - - - - $15,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$15,000
-
$
-
-
$
06: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$104,000
Cost:
-
- - - - - - - - $104,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$104,000
-
$
-
-
$
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$53,760
Cost:
-
- - - - - - - - $48,000 - $5,760 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$48,000
-
$
$5,760
-
$
TOTAL RECOMMENDED Savings:
$192,841
Cost:
$15,134
$556 4,983 $298 27 $16,827 2,070 $2,400 - $167,000 - $5,760 - $556
4,983
kWh
$298
27
kW-months/year
$16,827
2,070
MMBtu
$2,400
-
lb
$167,000
-
$
$5,760
-
$
TOTAL IMPLEMENTED Savings:
$175,203
Cost:
$8,200
$318 2,638 $298 27 $16,827 2,070 - - $152,000 - $5,760 - $318
2,638
kWh
$298
27
kW-months/year
$16,827
2,070
MMBtu
-
-
lb
$152,000
-
$
$5,760
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material