IAC Assessment: HO0148
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0148
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1997
Principal Product Electroplating
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 11,000
Annual Production 4,500 Pounds
Production Hrs. Annual 2,080
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $8,124 134,525 kWh $0.06
Electricity Demand $22,306 1,001 kW-months/year $22.28
Electricity Fees $2,879 - $ -
Natural Gas $26,544 3,097 MMBtu $8.57
TOTAL ENERGY COSTS $79,853
RECOMMENDED SAVINGS* $39,169 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,189
#|Description Savings
Cost
Status Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes
$ kW-months/year $ $ $ MMBtu $ Tgal $ $
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,488
Cost:
$2,196
- - - - $1,488 164 - - - - -
-
kW-months/year
-
-
$
$1,488
164
MMBtu
-
-
Tgal
-
-
$
02: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$6,600
Cost:
$250
- - - - - - $6,600 - - - -
-
kW-months/year
-
-
$
-
-
MMBtu
$6,600
-
Tgal
-
-
$
03: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$9,425
Cost:
$5,000
- - - - - - - - $9,425 - -
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$9,425
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$572
Cost:
$370
- - - - $572 65 - - - - -
-
kW-months/year
-
-
$
$572
65
MMBtu
-
-
Tgal
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,408
Cost:
$2,000
$2,408 108 - - - - - - - - $2,408
108
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
06: 3.4112 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER Savings:
$10,000
Cost:
$10,000
- - - - - - $10,000 3,000,000 - - -
-
kW-months/year
-
-
$
-
-
MMBtu
$10,000
3,000,000
Tgal
-
-
$
07: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$8,676
Cost:
$100
- - $8,676 - - - - - - - -
-
kW-months/year
$8,676
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$39,169
Cost:
$19,916
$2,408 108 $8,676 - $2,060 229 $16,600 3,000,000 $9,425 - $2,408
108
kW-months/year
$8,676
-
$
$2,060
229
MMBtu
$16,600
3,000,000
Tgal
$9,425
-
$
TOTAL IMPLEMENTED Savings:
$36,189
Cost:
$17,546
- - $8,676 - $1,488 164 $16,600 3,000,000 $9,425 - -
-
kW-months/year
$8,676
-
$
$1,488
164
MMBtu
$16,600
3,000,000
Tgal
$9,425
-
$
Savings
Cost
$ kW-months/year $ $ $ MMBtu $ Tgal $ $
Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes