IAC logo
IAC Assessment: HO0151
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0151
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1997
Principal Product Dental X-ray equipment
NAICS n/a
SIC 3899 -
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 30,000
Annual Production 2,000 Pieces
Production Hrs. Annual 2,340
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,294 456,038 kWh $0.06
Electricity Demand $61,608 2,610 kW-months/year $23.60
Electricity Fees $6,707 - $ -
Natural Gas $595 50 MMBtu $11.90
TOTAL ENERGY COSTS $103,004
RECOMMENDED SAVINGS* $36,839 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,739
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,364
Cost:
$5,745
$439 7,620 $925 36 - - - - $439
7,620
kWh
$925
36
kW-months/year
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$375
Cost:
$400
$121 2,052 $254 11 - - - - $121
2,052
kWh
$254
11
kW-months/year
-
-
lb
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,900
Cost:
$6,500
- - - - $3,900 96,000 - - -
-
kWh
-
-
kW-months/year
$3,900
96,000
lb
-
-
$
04: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$31,200
Cost:
$5,400
- - - - - - $31,200 - -
-
kWh
-
-
kW-months/year
-
-
lb
$31,200
-
$
TOTAL RECOMMENDED Savings:
$36,839
Cost:
$18,045
$560 9,672 $1,179 47 $3,900 96,000 $31,200 - $560
9,672
kWh
$1,179
47
kW-months/year
$3,900
96,000
lb
$31,200
-
$
TOTAL IMPLEMENTED Savings:
$1,739
Cost:
$6,145
$560 9,672 $1,179 47 - - - - $560
9,672
kWh
$1,179
47
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes