IAC Assessment: HO0157
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0157
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1997
Principal Product Pharmaceutical products
NAICS n/a
SIC 2833 - Medicinals And Botanicals
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 246,000
Annual Production 9,624,000 Pieces
Production Hrs. Annual 6,240
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $256,057 3,095,545 kWh $0.08
Electricity Demand $63,620 7,575 kW-months/year $8.40
Electricity Fees $(-36,608) - $ -
Natural Gas $64,617 14,929 MMBtu $4.33
TOTAL ENERGY COSTS $397,750
RECOMMENDED SAVINGS* $117,011 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $77,989
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$34,962
Cost:
$81,329
$28,511 343,200 $6,451 768 - - - - - - - - $28,511
343,200
kWh
$6,451
768
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,732
Cost:
$300
$2,287 27,550 $445 53 - - - - - - - - $2,287
27,550
kWh
$445
53
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
03: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$1,213
Cost:
$350
$1,213 14,654 - - - - - - - - - - $1,213
14,654
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$12,745
Cost:
$1,800
$12,745 153,576 - - - - - - - - - - $12,745
153,576
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,419
Cost:
$1,000
$3,699 44,549 $720 86 - - - - - - - - $3,699
44,549
kWh
$720
86
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$10,486
Cost:
$11,610
- - - - $10,486 2,422 - - - - - - -
-
kWh
-
-
kW-months/year
$10,486
2,422
MMBtu
-
-
gal
-
-
$
-
-
$
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$5,850
Cost:
$20,000
- - - - - - - - $5,850 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$5,850
-
$
-
-
$
08: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$8,640
Cost:
$500
- - - - - - - - $8,640 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$8,640
-
$
-
-
$
09: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$4,716
Cost:
$10,000
- - - - - - - - - - $4,716 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$4,716
-
$
10: 3.3127 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS Savings:
$31,248
Cost:
$20,000
- - - - - - $31,248 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$31,248
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$117,011
Cost:
$146,889
$48,455 583,529 $7,616 907 $10,486 2,422 $31,248 - $14,490 - $4,716 - $48,455
583,529
kWh
$7,616
907
kW-months/year
$10,486
2,422
MMBtu
$31,248
-
gal
$14,490
-
$
$4,716
-
$
TOTAL IMPLEMENTED Savings:
$77,989
Cost:
$131,679
$29,724 357,854 $6,451 768 - - $31,248 - $5,850 - $4,716 - $29,724
357,854
kWh
$6,451
768
kW-months/year
-
-
MMBtu
$31,248
-
gal
$5,850
-
$
$4,716
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material