IAC Assessment: HO0168
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0168
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1998
Principal Product Concrete Mixes
NAICS n/a
SIC 3270 -
Sales $5,000,000-$10,000,000
# of Employees 41
Plant Area (Sq.Ft.) 35,000
Annual Production 150,000 Tons
Production Hrs. Annual 3,400
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,832 927,022 kWh $0.09
Electricity Demand $34,602 3,681 kW-months/year $9.40
Electricity Fees $140 - $ -
Natural Gas $70,061 23,280 MMBtu $3.01
TOTAL ENERGY COSTS $185,635
RECOMMENDED SAVINGS* $70,435 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,075
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$824
Cost:
$505
$824 9,379 - - - - - - - - $824
9,379
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,230
Cost:
$50
$2,340 26,964 $890 95 - - - - - - $2,340
26,964
kWh
$890
95
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,141
Cost:
$755
- - - - $2,141 711 - - - - -
-
kWh
-
-
kW-months/year
$2,141
711
MMBtu
-
-
$
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,473
Cost:
$6,290
- - - - $2,473 822 - - - - -
-
kWh
-
-
kW-months/year
$2,473
822
MMBtu
-
-
$
-
-
$
05: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$15,746
Cost:
$22,000
- - - - $2,471 821 $13,275 - - - -
-
kWh
-
-
kW-months/year
$2,471
821
MMBtu
$13,275
-
$
-
-
$
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$46,021
Cost:
$100,000
- - - - $21,021 6,984 $20,000 - $5,000 - -
-
kWh
-
-
kW-months/year
$21,021
6,984
MMBtu
$20,000
-
$
$5,000
-
$
TOTAL RECOMMENDED Savings:
$70,435
Cost:
$129,600
$3,164 36,343 $890 95 $28,106 9,338 $33,275 - $5,000 - $3,164
36,343
kWh
$890
95
kW-months/year
$28,106
9,338
MMBtu
$33,275
-
$
$5,000
-
$
TOTAL IMPLEMENTED Savings:
$50,075
Cost:
$100,555
$3,164 36,343 $890 95 $21,021 6,984 $20,000 - $5,000 - $3,164
36,343
kWh
$890
95
kW-months/year
$21,021
6,984
MMBtu
$20,000
-
$
$5,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost