Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Hofstra Univ. |
---|---|
Assessment Year | 1998 |
Principal Product | Travel trailers |
NAICS | n/a |
SIC | 3711 - Motor Vehicles And Car Bodies |
Sales | $10,000,000-$50,000,000 |
# of Employees | 221 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 1,693 Pieces |
Production Hrs. Annual | 2,115 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $56,398 | 881,008 | kWh | $0.06 |
Electricity Demand | $28,488 | 4,105 | kW-months/year | $6.94 |
Electricity Fees | $202 | - | $ | - |
Fuel Oil #2 | $24,090 | 5,454 | MMBtu | $4.42 |
TOTAL ENERGY COSTS | $157,178 | |||
RECOMMENDED SAVINGS* | $66,272 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,527 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,110 Cost: $35,934 |
$6,697 | 105,217 | $4,413 | 636 | - | - | - | - | - | - |
$6,697 105,217 kWh |
$4,413 636 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $652 Cost: $500 |
$394 | 6,155 | $258 | 37 | - | - | - | - | - | - |
$394 6,155 kWh |
$258 37 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $920 Cost: $20 |
$555 | 8,792 | $365 | 53 | - | - | - | - | - | - |
$555 8,792 kWh |
$365 53 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $455 Cost: $60 |
$455 | 7,034 | - | - | - | - | - | - | - | - |
$455 7,034 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,250 Cost: $200 |
- | - | - | - | $1,250 | 283 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,250 283 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $3,205 Cost: $9,600 |
- | - | - | - | $3,205 | 409 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,205 409 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $774 Cost: $750 |
- | - | - | - | $774 | 175 | - | - | - | - |
- - kWh |
- - kW-months/year |
$774 175 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $4,800 Cost: $5,200 |
- | - | - | - | - | - | $4,800 | 1,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,800 1,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $611 Cost: $500 |
- | - | - | - | - | - | - | - | $611 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$611 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $15,000 Cost: $1,040 |
- | - | - | - | - | - | - | - | $15,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$15,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $24,440 Cost: $500 |
- | - | - | - | - | - | - | - | $24,440 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$24,440 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $3,055 Cost: $2,500 |
- | - | - | - | - | - | - | - | $3,055 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$3,055 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $66,272 Cost: $56,804 |
$8,101 | 127,198 | $5,036 | 726 | $5,229 | 867 | $4,800 | 1,000 | $43,106 | - | $8,101 127,198 kWh |
$5,036 726 kW-months/year |
$5,229 867 MMBtu |
$4,800 1,000 lb |
$43,106 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,527 Cost: $52,564 |
$8,101 | 127,198 | $5,036 | 726 | $3,979 | 584 | $4,800 | 1,000 | $611 | - | $8,101 127,198 kWh |
$5,036 726 kW-months/year |
$3,979 584 MMBtu |
$4,800 1,000 lb |
$611 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes |