Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Hofstra Univ. |
---|---|
Assessment Year | 1998 |
Principal Product | Loose leaf Binders |
NAICS | n/a |
SIC | 2782 - Blankbooks And Looseleaf Binders |
Sales | $1,000,000-$5,000,000 |
# of Employees | 36 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 1,030,000 Pieces |
Production Hrs. Annual | 2,250 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $24,812 | 308,030 | kWh | $0.08 |
Electricity Demand | $19,651 | 1,562 | kW-months/year | $12.58 |
Electricity Fees | $(-581) | - | $ | - |
Natural Gas | $17,897 | 2,668 | MMBtu | $6.71 |
Fuel Oil #2 | $7,815 | 1,075 | MMBtu | $7.27 |
TOTAL ENERGY COSTS | $69,594 | |||
RECOMMENDED SAVINGS* | $12,377 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,262 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,879 Cost: $13,312 |
$1,521 | 18,757 | $1,358 | 108 | - | - | - | - | - | - |
$1,521 18,757 kWh |
$1,358 108 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $575 Cost: $20 |
$297 | 3,810 | $278 | 22 | - | - | - | - | - | - |
$297 3,810 kWh |
$278 22 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,492 Cost: $300 |
$1,803 | 22,274 | $1,689 | 134 | - | - | - | - | - | - |
$1,803 22,274 kWh |
$1,689 134 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $708 Cost: $990 |
- | - | - | - | $708 | 106 | - | - | - | - |
- - kWh |
- - kW-months/year |
$708 106 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $316 Cost: $47 |
- | - | - | - | $316 | 47 | - | - | - | - |
- - kWh |
- - kW-months/year |
$316 47 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $3,907 Cost: $1,500 |
- | - | - | - | - | - | $3,907 | 538 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,907 538 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $500 Cost: $2,000 |
- | - | - | - | - | - | - | - | $500 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,377 Cost: $18,169 |
$3,621 | 44,841 | $3,325 | 264 | $1,024 | 153 | $3,907 | 538 | $500 | - | $3,621 44,841 kWh |
$3,325 264 kW-months/year |
$1,024 153 MMBtu |
$3,907 538 MMBtu |
$500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,262 Cost: $13,679 |
$3,621 | 44,841 | $3,325 | 264 | $316 | 47 | - | - | - | - | $3,621 44,841 kWh |
$3,325 264 kW-months/year |
$316 47 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Ancillary Material Cost |