Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1998
Principal Product sequins
NAICS n/a
SIC 2396 - Automotive And Apparel Trimmings
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 85,000
Annual Production 640,000 Pounds
Production Hrs. Annual 4,113
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,636 658,851 kWh $0.06
Electricity Demand $49,026 2,124 kW-months/year $23.08
Electricity Fees $6,690 - $ -
Natural Gas $13,750 1,915 MMBtu $7.18
Fuel Oil #2 $5,097 625 MMBtu $8.16
TOTAL ENERGY COSTS $133,199
RECOMMENDED SAVINGS* $59,873 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,062
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Electricity Usage Natural Gas Fuel Oil #2 Solid Waste (non-haz) Personnel Changes
$ kWh $ MMBtu $ MMBtu $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$913
Cost:
$1,443
$913 15,826 - - - - - - - - $913
15,826
kWh
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$640
Cost:
$625
$640 65,944 - - - - - - - - $640
65,944
kWh
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,026
Cost:
$1,000
- - $1,026 143 - - - - - - -
-
kWh
$1,026
143
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,785
Cost:
$6,000
$(-231) (-4,103) $1,378 192 $1,638 201 - - - - $(-231)
(-4,103)
kWh
$1,378
192
MMBtu
$1,638
201
MMBtu
-
-
lb
-
-
$
05: 4.632 CHANGE OPERATING CONDITIONS Savings:
$27,147
Cost:
$3,525
- - - - - - - - $27,147 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
lb
$27,147
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$9,729
Cost:
$500
- - - - - - $9,729 108,000 - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$9,729
108,000
lb
-
-
$
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$4,000
Cost:
$500
- - - - - - $4,000 16,000 - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$4,000
16,000
lb
-
-
$
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$12,800
Cost:
$500
- - - - - - $12,800 12,800 - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$12,800
12,800
lb
-
-
$
09: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$833
Cost:
$500
- - - - - - $833 1,000 - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$833
1,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$59,873
Cost:
$14,593
$1,322 77,667 $2,404 335 $1,638 201 $27,362 137,800 $27,147 - $1,322
77,667
kWh
$2,404
335
MMBtu
$1,638
201
MMBtu
$27,362
137,800
lb
$27,147
-
$
TOTAL IMPLEMENTED Savings:
$56,062
Cost:
$7,593
$1,553 81,770 - - - - $27,362 137,800 $27,147 - $1,553
81,770
kWh
-
-
MMBtu
-
-
MMBtu
$27,362
137,800
lb
$27,147
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ lb $ $
Electricity Usage Natural Gas Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Electricity Usage Natural Gas Fuel Oil #2 Solid Waste (non-haz) Personnel Changes