IAC logo
IAC Assessment: HO0180
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0180
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1998
Principal Product Quartzware glass products
NAICS n/a
SIC 3641 - Electric Lamps
Sales $5,000,000-$10,000,000
# of Employees 20
Plant Area (Sq.Ft.) 75,000
Annual Production 3 Thousand Feet
Production Hrs. Annual 2,295
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $8,742 92,028 kWh $0.09
Electricity Demand $5,654 727 kW-months/year $7.78
Electricity Fees $176 - $ -
Natural Gas $1,183 147 MMBtu $8.05
Other Gas $74,046 1,421 MMBtu $52.11
TOTAL ENERGY COSTS $89,801
RECOMMENDED SAVINGS* $44,298 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,004
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$3,722
Cost:
-
- - - - - - $3,722 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,722
-
MMBtu
-
-
$
02: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$1,852
Cost:
-
- - - - $(-1,852) (-71) $3,704 71 - - -
-
kWh
-
-
kW-months/year
$(-1,852)
(-71)
MMBtu
$3,704
71
MMBtu
-
-
$
03: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$2,004
Cost:
$1,000
$91 879 $47 6 - - - - $1,866 - $91
879
kWh
$47
6
kW-months/year
-
-
MMBtu
-
-
MMBtu
$1,866
-
$
04: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$36,720
Cost:
$30,000
- - - - - - - - $36,720 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$36,720
-
$
TOTAL RECOMMENDED Savings:
$44,298
Cost:
$31,000
$91 879 $47 6 $(-1,852) (-71) $7,426 71 $38,586 - $91
879
kWh
$47
6
kW-months/year
$(-1,852)
(-71)
MMBtu
$7,426
71
MMBtu
$38,586
-
$
TOTAL IMPLEMENTED Savings:
$2,004
Cost:
$1,000
$91 879 $47 6 - - - - $1,866 - $91
879
kWh
$47
6
kW-months/year
-
-
MMBtu
-
-
MMBtu
$1,866
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes