IAC logo
IAC Assessment: HO0185
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0185
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1998
Principal Product Crushed Stones
NAICS n/a
SIC 3281 - Cut Stone And Stone Products
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 43,560
Annual Production 403,000 Tons
Production Hrs. Annual 2,600
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,625 1,198,710 kWh $0.04
Electricity Demand $80,717 8,096 kW-months/year $9.97
Electricity Fees $(-27,706) - $ -
TOTAL ENERGY COSTS $102,636
RECOMMENDED SAVINGS* $28,538 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,980
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$229
Cost:
$808
$229 5,569 - - - - - - $229
5,569
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$3,970
Cost:
$20,000
- - - - $3,970 - - - -
-
kWh
-
-
kW-months/year
$3,970
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,751
Cost:
$3,981
- - - - $2,751 - - - -
-
kWh
-
-
kW-months/year
$2,751
-
$
-
-
$
04: 2.8112 COMBINE UTILITY METERS Savings:
$5,982
Cost:
$3,000
- - $5,982 600 - - - - -
-
kWh
$5,982
600
kW-months/year
-
-
$
-
-
$
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$15,606
Cost:
$2,500
- - - - - - $15,606 - -
-
kWh
-
-
kW-months/year
-
-
$
$15,606
-
$
TOTAL RECOMMENDED Savings:
$28,538
Cost:
$30,289
$229 5,569 $5,982 600 $6,721 - $15,606 - $229
5,569
kWh
$5,982
600
kW-months/year
$6,721
-
$
$15,606
-
$
TOTAL IMPLEMENTED Savings:
$2,980
Cost:
$4,789
$229 5,569 - - $2,751 - - - $229
5,569
kWh
-
-
kW-months/year
$2,751
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes