IAC Assessment: HO0199
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0199
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1999
Principal Product Newspapers
NAICS n/a
SIC 2711 - Newspapers
Sales $10,000,000-$50,000,000
# of Employees 83
Plant Area (Sq.Ft.) 55,000
Annual Production 27,217,000 Pieces
Production Hrs. Annual 3,162
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,021 463,365 kWh $0.09
Electricity Demand $23,184 3,006 kW-months/year $7.71
Electricity Fees $5,597 - $ -
Natural Gas $15,773 1,780 MMBtu $8.86
TOTAL ENERGY COSTS $84,575
RECOMMENDED SAVINGS* $43,688 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,718
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$450
Cost:
$1,200
$450 5,275 - - - - - - $450
5,275
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,100
Cost:
-
- - $3,100 - - - - - -
-
kWh
$3,100
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$3,627
Cost:
$1,300
- - - - $3,627 409 - - -
-
kWh
-
-
kW-months/year
$3,627
409
MMBtu
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,503
Cost:
$750
- - - - $2,503 283 - - -
-
kWh
-
-
kW-months/year
$2,503
283
MMBtu
-
-
$
05: 4.4250 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$2,808
Cost:
$5,000
- - - - - - $2,808 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,808
-
$
06: 4.4440 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$4,680
Cost:
$150
- - - - - - $4,680 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,680
-
$
07: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$26,520
Cost:
$28,000
- - - - - - $26,520 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$26,520
-
$
TOTAL RECOMMENDED Savings:
$43,688
Cost:
$36,400
$450 5,275 $3,100 - $6,130 692 $34,008 - $450
5,275
kWh
$3,100
-
kW-months/year
$6,130
692
MMBtu
$34,008
-
$
TOTAL IMPLEMENTED Savings:
$16,718
Cost:
$7,200
- - $3,100 - $6,130 692 $7,488 - -
-
kWh
$3,100
-
kW-months/year
$6,130
692
MMBtu
$7,488
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes