IAC logo
IAC Assessment: HO0202
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0202
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1999
Principal Product Coated Glass
NAICS n/a
SIC 3211 - Flat Glass
Sales $5,000,000-$10,000,000
# of Employees 150
Plant Area (Sq.Ft.) 31,000
Annual Production 1,000,000 Thousand Feet
Production Hrs. Annual 2,750
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $208,591 2,572,685 kWh $0.08
Electricity Demand $68,273 17,835 kW-months/year $3.83
Electricity Fees $(-19,898) - $ -
Natural Gas $20,232 2,973 MMBtu $6.81
TOTAL ENERGY COSTS $289,656
RECOMMENDED SAVINGS* $23,939 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,728
Cost:
$15,851
$4,749 58,617 $979 256 - - - - $4,749
58,617
kWh
$979
256
kW-months/year
-
-
lb
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,525
Cost:
$45
$1,265 15,533 $260 68 - - - - $1,265
15,533
kWh
$260
68
kW-months/year
-
-
lb
-
-
$
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$3,266
Cost:
$1,190
$2,704 33,411 $562 146 - - - - $2,704
33,411
kWh
$562
146
kW-months/year
-
-
lb
-
-
$
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$6,188
Cost:
$2,475
- - - - - - $6,188 - -
-
kWh
-
-
kW-months/year
-
-
lb
$6,188
-
$
05: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$840
Cost:
$500
- - - - - - $840 - -
-
kWh
-
-
kW-months/year
-
-
lb
$840
-
$
06: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$3,900
Cost:
$4,000
- - - - - - $3,900 - -
-
kWh
-
-
kW-months/year
-
-
lb
$3,900
-
$
07: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS Savings:
$2,492
Cost:
$350
- - - - $2,492 14,950 - - -
-
kWh
-
-
kW-months/year
$2,492
14,950
lb
-
-
$
TOTAL RECOMMENDED Savings:
$23,939
Cost:
$24,411
$8,718 107,561 $1,801 470 $2,492 14,950 $10,928 - $8,718
107,561
kWh
$1,801
470
kW-months/year
$2,492
14,950
lb
$10,928
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost