IAC logo
IAC Assessment: HO0205
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0205
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1999
Principal Product Pressure-sensitive tape
NAICS n/a
SIC 2672 - Paper Coated And Laminated, Nec
Sales $50,000,000-$100,000,000
# of Employees 130
Plant Area (Sq.Ft.) 226,000
Annual Production 1,350,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $300,190 3,679,953 kWh $0.08
Electricity Demand $86,199 9,576 kW-months/year $9.00
Electricity Fees $(-36,490) - $ -
Natural Gas $156,848 39,152 MMBtu $4.01
TOTAL ENERGY COSTS $543,327
RECOMMENDED SAVINGS* $69,820 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,646
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,922
Cost:
$12,583
$5,332 65,358 $2,590 288 - - - - - - $5,332
65,358
kWh
$2,590
288
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,560
Cost:
$11,408
$6,237 76,495 $1,323 147 - - - - - - $6,237
76,495
kWh
$1,323
147
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,069
Cost:
-
$1,069 13,189 - - - - - - - - $1,069
13,189
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$8,757
Cost:
$5,030
$8,757 107,268 - - - - - - - - $8,757
107,268
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,237
Cost:
$833
- - - - $2,237 558 - - - - -
-
kWh
-
-
kW-months/year
$2,237
558
MMBtu
-
-
Tgal
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$24,015
Cost:
$27,500
- - - - - - - - $24,015 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$24,015
-
$
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$18,260
Cost:
$24,000
- - - - - - $18,260 1,660,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$18,260
1,660,000
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$69,820
Cost:
$81,354
$21,395 262,310 $3,913 435 $2,237 558 $18,260 1,660,000 $24,015 - $21,395
262,310
kWh
$3,913
435
kW-months/year
$2,237
558
MMBtu
$18,260
1,660,000
Tgal
$24,015
-
$
TOTAL IMPLEMENTED Savings:
$35,646
Cost:
$40,438
$16,063 196,952 $1,323 147 - - $18,260 1,660,000 - - $16,063
196,952
kWh
$1,323
147
kW-months/year
-
-
MMBtu
$18,260
1,660,000
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal One-time Revenue or Avoided Cost