IAC logo
IAC Assessment: HO0212
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0212
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1999
Principal Product Electric Platers
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $5,000,000-$10,000,000
# of Employees 61
Plant Area (Sq.Ft.) 36,000
Annual Production 15,000 Pounds
Production Hrs. Annual 6,120
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,922 1,871,336 kWh $0.06
Electricity Demand $46,585 5,201 kW-months/year $8.96
Electricity Fees $(-2,472) - $ -
Natural Gas $11,525 2,765 MMBtu $4.17
TOTAL ENERGY COSTS $167,560
RECOMMENDED SAVINGS* $56,592 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,079
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,162
Cost:
$9,938
$3,990 66,823 $1,172 131 - - - - $3,990
66,823
kWh
$1,172
131
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,715
Cost:
$400
$3,715 62,134 - - - - - - $3,715
62,134
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,284
Cost:
$7,500
$10,979 183,763 $3,224 360 $(-3,919) (-783) - - $10,979
183,763
kWh
$3,224
360
kW-months/year
$(-3,919)
(-783)
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,104
Cost:
$6,840
$2,104 35,170 - - - - - - $2,104
35,170
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,419
Cost:
$1,467
- - - - $2,419 580 - - -
-
kWh
-
-
kW-months/year
$2,419
580
MMBtu
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,548
Cost:
$2,882
- - - - $1,548 371 - - -
-
kWh
-
-
kW-months/year
$1,548
371
MMBtu
-
-
$
07: 4.6320 CHANGE OPERATING CONDITIONS Savings:
$8,954
Cost:
$20,000
- - - - - - $8,954 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,954
-
$
08: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$11,437
Cost:
$2,882
- - - - - - $11,437 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,437
-
$
09: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$4,590
Cost:
$12,000
- - - - - - $4,590 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,590
-
$
10: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$6,379
Cost:
$500
- - - - - - $6,379 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,379
-
$
TOTAL RECOMMENDED Savings:
$56,592
Cost:
$64,409
$20,788 347,890 $4,396 491 $48 168 $31,360 - $20,788
347,890
kWh
$4,396
491
kW-months/year
$48
168
MMBtu
$31,360
-
$
TOTAL IMPLEMENTED Savings:
$23,079
Cost:
$6,664
$3,715 62,134 - - $1,548 371 $17,816 - $3,715
62,134
kWh
-
-
kW-months/year
$1,548
371
MMBtu
$17,816
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost