Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Hofstra Univ. |
---|---|
Assessment Year | 2000 |
Principal Product | Self-Adhesive Laminates |
NAICS | n/a |
SIC | 2754 - Commercial Printing, Gravure |
Sales | $50,000,000-$100,000,000 |
# of Employees | 175 |
Plant Area (Sq.Ft.) | 230,000 |
Annual Production | 141,000 Thousand Feet |
Production Hrs. Annual | 6,120 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $357,828 | 5,821,219 | kWh | $0.06 |
Electricity Demand | $106,157 | 14,394 | kW-months/year | $7.38 |
Electricity Fees | $582 | - | $ | - |
Natural Gas | $387,172 | 105,564 | MMBtu | $3.67 |
TOTAL ENERGY COSTS | $856,803 | |||
RECOMMENDED SAVINGS* | $71,968 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $62,743 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $17,368 Cost: $41,546 |
$13,446 | 218,640 | $3,922 | 532 | - | - | - | - |
$13,446 218,640 kWh |
$3,922 532 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,628 Cost: $1,500 |
$2,128 | 34,584 | $500 | 68 | - | - | - | - |
$2,128 34,584 kWh |
$500 68 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $4,499 Cost: $2,640 |
$4,499 | 359,320 | - | - | - | - | - | - |
$4,499 359,320 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $1,069 Cost: - |
- | - | - | - | - | - | $1,069 | - |
- - kWh |
- - kW-months/year |
- - lb |
$1,069 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL |
Savings: $3,825 Cost: $5,000 |
- | - | - | - | - | - | $3,825 | - |
- - kWh |
- - kW-months/year |
- - lb |
$3,825 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $5,400 Cost: $20,000 |
- | - | - | - | - | - | $5,400 | - |
- - kWh |
- - kW-months/year |
- - lb |
$5,400 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $37,179 Cost: - |
- | - | - | - | $37,179 | - | - | - |
- - kWh |
- - kW-months/year |
$37,179 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $71,968 Cost: $70,686 |
$20,073 | 612,544 | $4,422 | 600 | $37,179 | - | $10,294 | - | $20,073 612,544 kWh |
$4,422 600 kW-months/year |
$37,179 - lb |
$10,294 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $62,743 Cost: $45,686 |
$20,073 | 612,544 | $4,422 | 600 | $37,179 | - | $1,069 | - | $20,073 612,544 kWh |
$4,422 600 kW-months/year |
$37,179 - lb |
$1,069 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | One-time Revenue or Avoided Cost |