IAC logo
IAC Assessment: HO0220
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0220
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 2000
Principal Product Telecommunication Eqpt.
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 95,000
Annual Production 1,400 Pieces
Production Hrs. Annual 4,335
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,547 1,600,821 kWh $0.05
Electricity Demand $72,622 6,259 kW-months/year $11.60
Electricity Fees $4,710 - $ -
Natural Gas $11,600 1,552 MMBtu $7.47
TOTAL ENERGY COSTS $174,479
RECOMMENDED SAVINGS* $24,810 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,042
Cost:
$21,460
$5,026 94,080 $3,016 260 - - $5,026
94,080
kWh
$3,016
260
kW-months/year
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,415
Cost:
$1,000
$2,415 45,135 - - - - $2,415
45,135
kWh
-
-
kW-months/year
-
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$449
Cost:
$221
$449 8,499 - - - - $449
8,499
kWh
-
-
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,118
Cost:
$40
$1,326 24,912 $792 68 - - $1,326
24,912
kWh
$792
68
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,955
Cost:
$600
$2,955 55,393 - - - - $2,955
55,393
kWh
-
-
kW-months/year
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,181
Cost:
$120
$749 14,068 $432 37 - - $749
14,068
kWh
$432
37
kW-months/year
-
-
$
07: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$7,650
Cost:
$5,000
- - - - $7,650 - -
-
kWh
-
-
kW-months/year
$7,650
-
$
TOTAL RECOMMENDED Savings:
$24,810
Cost:
$28,441
$12,920 242,087 $4,240 365 $7,650 - $12,920
242,087
kWh
$4,240
365
kW-months/year
$7,650
-
$
TOTAL IMPLEMENTED Savings:
$7,000
Cost:
$1,941
$6,568 123,095 $432 37 - - $6,568
123,095
kWh
$432
37
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost