IAC logo
IAC Assessment: HO0224
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0224
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 2000
Principal Product Textile Machinery
NAICS n/a
SIC 3552 - Textile Machinery
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 66,000
Annual Production 4,500 Pieces
Production Hrs. Annual 4,680
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,513 799,238 kWh $0.05
Electricity Demand $32,462 3,269 kW-months/year $9.93
Electricity Fees $1,417 - $ -
Natural Gas $26,740 3,043 MMBtu $8.79
TOTAL ENERGY COSTS $102,132
RECOMMENDED SAVINGS* $33,270 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,109
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,372
Cost:
$18,408
$5,619 108,148 $2,753 277 - - - - $5,619
108,148
kWh
$2,753
277
kW-months/year
-
-
lb
-
-
$
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,241
Cost:
$106
$836 16,120 $405 41 - - - - $836
16,120
kWh
$405
41
kW-months/year
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$907
Cost:
$2,794
$609 11,723 $298 30 - - - - $609
11,723
kWh
$298
30
kW-months/year
-
-
lb
-
-
$
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$588
Cost:
-
$588 11,430 - - - - - - $588
11,430
kWh
-
-
kW-months/year
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,364
Cost:
$600
$3,364 64,771 - - - - - - $3,364
64,771
kWh
-
-
kW-months/year
-
-
lb
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,013
Cost:
-
$1,013 19,637 - - - - - - $1,013
19,637
kWh
-
-
kW-months/year
-
-
lb
-
-
$
07: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,970
Cost:
$396
- - - - - - $2,970 - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,970
-
$
08: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$2,674
Cost:
$500
- - - - - - $2,674 - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,674
-
$
09: 4.6320 CHANGE OPERATING CONDITIONS Savings:
$7,539
Cost:
$1,000
- - - - - - $7,539 - -
-
kWh
-
-
kW-months/year
-
-
lb
$7,539
-
$
10: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,068
Cost:
$20,000
- - - - - - $4,068 - -
-
kWh
-
-
kW-months/year
-
-
lb
$4,068
-
$
11: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$534
Cost:
$515
- - - - $534 - - - -
-
kWh
-
-
kW-months/year
$534
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$33,270
Cost:
$44,319
$12,029 231,829 $3,456 348 $534 - $17,251 - $12,029
231,829
kWh
$3,456
348
kW-months/year
$534
-
lb
$17,251
-
$
TOTAL IMPLEMENTED Savings:
$8,109
Cost:
$1,617
$4,200 80,891 $405 41 $534 - $2,970 - $4,200
80,891
kWh
$405
41
kW-months/year
$534
-
lb
$2,970
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost