IAC logo
IAC Assessment: HO0229
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0229
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 2000
Principal Product Internal Combustion Products
NAICS n/a
SIC 3433 - Heating Equipment, Except Electric
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 110,000
Annual Production 8,100 Pieces
Production Hrs. Annual 4,394
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,190 1,424,385 kWh $0.05
Electricity Demand $46,592 5,164 kW-months/year $9.02
Electricity Fees $5,961 - $ -
Natural Gas $29,247 4,876 MMBtu $6.00
TOTAL ENERGY COSTS $152,990
RECOMMENDED SAVINGS* $295,040 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,928
Cost:
$20,007
$3,961 79,132 $1,967 218 - - $3,961
79,132
kWh
$1,967
218
kW-months/year
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,032
Cost:
$700
$10,032 200,762 - - - - $10,032
200,762
kWh
-
-
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,524
Cost:
$240
$1,524 30,481 - - - - $1,524
30,481
kWh
-
-
kW-months/year
-
-
$
04: 4.5120 CONDENSE OPERATION INTO ONE BUILDING Savings:
$140,367
Cost:
$106,000
- - - - $140,367 - -
-
kWh
-
-
kW-months/year
$140,367
-
$
05: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$68,250
Cost:
$500,000
- - - - $68,250 - -
-
kWh
-
-
kW-months/year
$68,250
-
$
06: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$9,899
Cost:
$20,000
- - - - $9,899 - -
-
kWh
-
-
kW-months/year
$9,899
-
$
07: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$5,850
Cost:
$10,000
- - - - $5,850 - -
-
kWh
-
-
kW-months/year
$5,850
-
$
08: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$5,850
Cost:
$3,000
- - - - $5,850 - -
-
kWh
-
-
kW-months/year
$5,850
-
$
09: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$4,200
Cost:
$4,500
- - - - $4,200 - -
-
kWh
-
-
kW-months/year
$4,200
-
$
10: 4.5120 CONDENSE OPERATION INTO ONE BUILDING Savings:
$4,160
Cost:
$6,000
- - - - $4,160 - -
-
kWh
-
-
kW-months/year
$4,160
-
$
11: 4.5120 CONDENSE OPERATION INTO ONE BUILDING Savings:
$3,900
Cost:
$8,000
- - - - $3,900 - -
-
kWh
-
-
kW-months/year
$3,900
-
$
12: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$1,040
Cost:
$100
- - - - $1,040 - -
-
kWh
-
-
kW-months/year
$1,040
-
$
13: 4.1140 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$1,040
Cost:
$600
- - - - $1,040 - -
-
kWh
-
-
kW-months/year
$1,040
-
$
14: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$33,000
Cost:
$3,000
- - - - $33,000 - -
-
kWh
-
-
kW-months/year
$33,000
-
$
TOTAL RECOMMENDED Savings:
$295,040
Cost:
$682,147
$15,517 310,375 $1,967 218 $277,556 - $15,517
310,375
kWh
$1,967
218
kW-months/year
$277,556
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost