IAC Assessment: HO0237
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0237
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 2000
Principal Product Sweaters
NAICS n/a
SIC 2533 -
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 140,000
Annual Production 1,380,000 Pieces
Production Hrs. Annual 2,340
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,630 817,116 kWh $0.06
Electricity Demand $74,529 3,114 kW-months/year $23.93
Natural Gas $65,409 6,232 MMBtu $10.50
TOTAL ENERGY COSTS $189,568
RECOMMENDED SAVINGS* $139,765 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,520
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,410
Cost:
$11,135
$5,792 95,545 $3,618 151 - - $5,792
95,545
kWh
$3,618
151
kW-months/year
-
-
$
02: 4.5120 CONDENSE OPERATION INTO ONE BUILDING Savings:
$91,200
Cost:
$1,000
- - - - $91,200 - -
-
kWh
-
-
kW-months/year
$91,200
-
$
03: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$8,731
Cost:
$1,000
- - - - $8,731 - -
-
kWh
-
-
kW-months/year
$8,731
-
$
04: 4.4440 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$5,780
Cost:
$6,240
- - - - $5,780 - -
-
kWh
-
-
kW-months/year
$5,780
-
$
05: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$7,800
Cost:
$5,000
- - - - $7,800 - -
-
kWh
-
-
kW-months/year
$7,800
-
$
06: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$2,880
Cost:
$480
- - - - $2,880 - -
-
kWh
-
-
kW-months/year
$2,880
-
$
07: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$9,464
Cost:
$7,000
- - - - $9,464 - -
-
kWh
-
-
kW-months/year
$9,464
-
$
08: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$2,520
Cost:
$1,000
- - - - $2,520 - -
-
kWh
-
-
kW-months/year
$2,520
-
$
09: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$1,980
Cost:
$200
- - - - $1,980 - -
-
kWh
-
-
kW-months/year
$1,980
-
$
TOTAL RECOMMENDED Savings:
$139,765
Cost:
$33,055
$5,792 95,545 $3,618 151 $130,355 - $5,792
95,545
kWh
$3,618
151
kW-months/year
$130,355
-
$
TOTAL IMPLEMENTED Savings:
$2,520
Cost:
$1,000
- - - - $2,520 - -
-
kWh
-
-
kW-months/year
$2,520
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes