IAC logo
IAC Assessment: IA0012
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0012
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1991
Principal Product PLASTIC GARBAGE CANS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 230
Plant Area (Sq.Ft.) 0
Annual Production 6,885,000 Pieces
Production Hrs. Annual 8,736
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $585,468 17,824,736 kWh $0.03
Natural Gas $106,640 30,228 MMBtu $3.53
TOTAL ENERGY COSTS $692,108
RECOMMENDED SAVINGS* $47,308 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$32,690
Cost:
$52,000
$(-2,504) (-76,202) $35,194 9,970 - - $(-2,504)
(-76,202)
kWh
$35,194
9,970
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,436
Cost:
$1,120
$(-742) (-22,567) $2,178 617 - - $(-742)
(-22,567)
kWh
$2,178
617
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,630
Cost:
$6,000
$9,630 293,083 - - - - $9,630
293,083
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,552
Cost:
-
$4,532 138,042 - - $(-980) - $4,532
138,042
kWh
-
-
MMBtu
$(-980)
-
$
TOTAL RECOMMENDED Savings:
$47,308
Cost:
$59,120
$10,916 332,356 $37,372 10,587 $(-980) - $10,916
332,356
kWh
$37,372
10,587
MMBtu
$(-980)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes