IAC Assessment: IA0017
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0017
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1992
Principal Product PRESSURIZED TANKS
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $5,000,000-$10,000,000
# of Employees 68
Plant Area (Sq.Ft.) 0
Annual Production 17,570 Pieces
Production Hrs. Annual 4,420
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,217 1,784,877 kWh $0.06
Natural Gas $35,331 7,509 MMBtu $4.71
TOTAL ENERGY COSTS $142,548
RECOMMENDED SAVINGS* $37,000 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,295
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,858
Cost:
$700
- - $9,858 2,093 - - -
-
kWh
$9,858
2,093
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,694
Cost:
$2,000
$9,694 155,334 - - - - $9,694
155,334
kWh
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,603
Cost:
$500
$3,603 57,737 - - - - $3,603
57,737
kWh
-
-
MMBtu
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,470
Cost:
-
$2,470 39,566 - - - - $2,470
39,566
kWh
-
-
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$402
Cost:
$400
$402 6,448 - - - - $402
6,448
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$184
Cost:
$29
$213 3,517 - - $(-29) - $213
3,517
kWh
-
-
MMBtu
$(-29)
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$6,834
Cost:
$22,000
$(-1,701) (-27,257) $8,535 1,812 - - $(-1,701)
(-27,257)
kWh
$8,535
1,812
MMBtu
-
-
$
08: 2.7314 REDUCE VENTILATION AIR Savings:
$3,955
Cost:
$3,150
- - $3,955 840 - - -
-
kWh
$3,955
840
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$37,000
Cost:
$28,779
$14,681 235,345 $22,348 4,745 $(-29) - $14,681
235,345
kWh
$22,348
4,745
MMBtu
$(-29)
-
$
TOTAL IMPLEMENTED Savings:
$20,295
Cost:
$23,200
$1,902 30,480 $18,393 3,905 - - $1,902
30,480
kWh
$18,393
3,905
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes